Ormandy Optimajor GLP S 3.0 Technical And Maintenance Instructions Download Page 6

Page

6 / 19

3.2. Hydraulic coupling of the block to the installation

-

Connect the flow and return pipes of the installation.
The openings of the pipes are tapped at 2".

IMPORTANT:

-

The diameter of the flow and return pipes can not be reduced on a length of 200mm minimun.

-

Place the drain cock in the opening tapped at 3/4" on the front element of the furnace.

Saint Roch Couvin boilers are designed to function in hot water heating installations.

It is forbidden for the boilers to work

in thermosiphon (without circulating pump).

The circulating pump must be choose to ensure a difference of temperature between the flow and the return of minimum 5°C
and maximum35°C.
-

The recommended hydraulic diagram : heating circuit.

- After installing the cast-iron block, the boiler shall be

subjected to a water pressure of 4 = 5,2 bar (min. 4 bar), before
fitting the thermal insulation and the mantle. No leakage
must occur during the water test.

-

Positioning the bottom rear fixing plate (A) on the cast iron
block (on the rear section).

-

Using 2 M8 X 10 (DIN 933) screw, block the rear plate in its
position on the cast iron block.

-

Proceed in the same way for the other casing fixing plates:

the upper rear plate (B);
the bottom and upper front plates (C).

B

A

C

C

3.3. Mounting of the casing fixing plates

D

G

E

F

Pull

Pull

ASSEMBLINGBYHOOPING

ANDREINFORCEDLAP

-

Place the insulation (D) around the heating sections, taking care not to let it get between the elements.

-

Bind it with the tapes (E).

-

Place the pre-cut insulation on the back side (F) (hydraulic connection and connection with the chimney).

-

Hold in place with the tapes (G).

3.4. Fixing the insulation

IMPORTANT : The hydraulic connections of the
boiler to the heating circuit must be made taking into
account the overall dimensions of the boiler casing.

For optimal insulation

do not overtighten

tapping M8

Water pressuretest on boiler block

Summary of Contents for Optimajor GLP S 3.0

Page 1: ...Optimajor GLP S EXPORT OPTIMAJOR GLP S EXPORT 0111 00 OIL GASFIRED CENTRALHEATINGBOILER TECHNICALANDMAINTENANCEINSTRUCTIONS...

Page 2: ...6 Spare parts 18 7 Maintenance 20 8 Guarantee conditions on Optimajor GLP S 20 Page Contents User s advices The boiler must be installed and commissioned by a registered installer in accordance with...

Page 3: ...e calculated and carried out according to the standards in force the local obligations and the regulations of the manufacturer The hydraulic installations fuel or gases will be established according t...

Page 4: ...48 1 84 7 60 3 101 9 72 5 119 84 7 136 2 96 6 153 3 109 2 Combustion circuit vol dm Water side losses mbar 1 7 0 9 2 7 1 4 3 9 2 5 3 2 7 6 9 3 5 8 7 4 4 Relative standby loss Water capacity l Packed...

Page 5: ...edition of Clean Air Act 1993 should be observed To ensure safe operation of the boiler the chimney system shall be capable of the complete evacuation of the products of combustion at all times The e...

Page 6: ...the thermal insulation and the mantle No leakage must occur during the water test Positioningthebottomrearfixingplate A onthecastiron block on the rear section Using2M8X10 DIN933 screw blocktherearpla...

Page 7: ...ount the overall dimensions of the jacket Provide a coupling duct with a diameter of 200 mm Height of the axis of the duct 670 mm not including the base Place the chimney coupling duct Ensure the airt...

Page 8: ...e filling of the heating circuit Verify and check the watertightness of all connections Rinse the installation by empying it Bring the pressure up to the level in accordance with the manometric height...

Page 9: ...mp to ensure a difference of temperature between the start and return oftheboilerofminimum5 Cand ofmaximum35 C Beforeinstallingadevice itishighlysuggestedthattheinstallercheckstheconditionsofthechimne...

Page 10: ...arenotpartofthescopeof our supply but are mentioned because requiredforagoodplantperformance If all the plant radiators are equipped with thermostatic valves a differential pressure valve should be pl...

Page 11: ...f the hydraulic circuits is ensured apply the following sequence for the filling of the hot sanitary water circuit Z Z The fillingmust takeplace slowly the draincocksbeing openorunscrewed inorderto av...

Page 12: ...age again Remark As far as Ecosets are concerned are the electrical connections of the circula tionpumpoftheheatingcircuitmadein the control box outisde the boiler control panel 4 3 Electricalconnecti...

Page 13: ...ago range Climaticregulator delivered in option Lago Eco Lago E8 0634 In order to install this regulation it is necessary to interpose between the boiler connector block and the regulator a connection...

Page 14: ...plug of connector A 4 Connect the 10 poles white connector on the connector block II of the regulator 5 Connect directly the following probes on the connector block I of the regulator AFS external pr...

Page 15: ...P 12 poles plug of connector A 4 Connect the 10 poles white connector on the connector block II of the regulator 5 Connect directly the following probes on the connector block I of the regulator KFS b...

Page 16: ...cuit USING LIGHTING put the boiler under tension via the main switch set the boiler thermostat at the desired temperature after a temperature setting of the installation make again a general purging a...

Page 17: ...Page 17 19 6 Spare parts list Boiler Cast ironblock 20 21 26 12 11 10 13 14 15 16 17 19 18 23 24 25 22 32 37 36 38 30 34 33 31 32 31 35...

Page 18: ...7 0 1 80 600 80940 22 4 M16 x 1060 tie bar n 8 0 1 80 600 81060 23 1 Reducing plug 1 1 4 3 4 1 60 110 10061 24 4 Plug 1 1 4 with square hole fig 596 1 60 100 30010 25 2 Eye bolt 1 80 121 10063 26 acc...

Page 19: ...uted airincludingcorrosiveelementssuch as chlorine fluorine sulphur etc The use of water which is found to be unsuitable would also invalidate our guarantee 2 Our guarantee specified below commences o...