Ormandy Optimajor GLP S 3.0 Technical And Maintenance Instructions Download Page 1

Optimajor GLP S

EXPORT

OPTIMAJOR GLP S EXPORT - 0111-00

OIL/GAS FIRED

CENTRALHEATINGBOILER

T

ECHNICAL AND

M

AINTENANCE

I

NSTRUCTIONS

Summary of Contents for Optimajor GLP S 3.0

Page 1: ...Optimajor GLP S EXPORT OPTIMAJOR GLP S EXPORT 0111 00 OIL GASFIRED CENTRALHEATINGBOILER TECHNICALANDMAINTENANCEINSTRUCTIONS...

Page 2: ...6 Spare parts 18 7 Maintenance 20 8 Guarantee conditions on Optimajor GLP S 20 Page Contents User s advices The boiler must be installed and commissioned by a registered installer in accordance with...

Page 3: ...e calculated and carried out according to the standards in force the local obligations and the regulations of the manufacturer The hydraulic installations fuel or gases will be established according t...

Page 4: ...48 1 84 7 60 3 101 9 72 5 119 84 7 136 2 96 6 153 3 109 2 Combustion circuit vol dm Water side losses mbar 1 7 0 9 2 7 1 4 3 9 2 5 3 2 7 6 9 3 5 8 7 4 4 Relative standby loss Water capacity l Packed...

Page 5: ...edition of Clean Air Act 1993 should be observed To ensure safe operation of the boiler the chimney system shall be capable of the complete evacuation of the products of combustion at all times The e...

Page 6: ...the thermal insulation and the mantle No leakage must occur during the water test Positioningthebottomrearfixingplate A onthecastiron block on the rear section Using2M8X10 DIN933 screw blocktherearpla...

Page 7: ...ount the overall dimensions of the jacket Provide a coupling duct with a diameter of 200 mm Height of the axis of the duct 670 mm not including the base Place the chimney coupling duct Ensure the airt...

Page 8: ...e filling of the heating circuit Verify and check the watertightness of all connections Rinse the installation by empying it Bring the pressure up to the level in accordance with the manometric height...

Page 9: ...mp to ensure a difference of temperature between the start and return oftheboilerofminimum5 Cand ofmaximum35 C Beforeinstallingadevice itishighlysuggestedthattheinstallercheckstheconditionsofthechimne...

Page 10: ...arenotpartofthescopeof our supply but are mentioned because requiredforagoodplantperformance If all the plant radiators are equipped with thermostatic valves a differential pressure valve should be pl...

Page 11: ...f the hydraulic circuits is ensured apply the following sequence for the filling of the hot sanitary water circuit Z Z The fillingmust takeplace slowly the draincocksbeing openorunscrewed inorderto av...

Page 12: ...age again Remark As far as Ecosets are concerned are the electrical connections of the circula tionpumpoftheheatingcircuitmadein the control box outisde the boiler control panel 4 3 Electricalconnecti...

Page 13: ...ago range Climaticregulator delivered in option Lago Eco Lago E8 0634 In order to install this regulation it is necessary to interpose between the boiler connector block and the regulator a connection...

Page 14: ...plug of connector A 4 Connect the 10 poles white connector on the connector block II of the regulator 5 Connect directly the following probes on the connector block I of the regulator AFS external pr...

Page 15: ...P 12 poles plug of connector A 4 Connect the 10 poles white connector on the connector block II of the regulator 5 Connect directly the following probes on the connector block I of the regulator KFS b...

Page 16: ...cuit USING LIGHTING put the boiler under tension via the main switch set the boiler thermostat at the desired temperature after a temperature setting of the installation make again a general purging a...

Page 17: ...Page 17 19 6 Spare parts list Boiler Cast ironblock 20 21 26 12 11 10 13 14 15 16 17 19 18 23 24 25 22 32 37 36 38 30 34 33 31 32 31 35...

Page 18: ...7 0 1 80 600 80940 22 4 M16 x 1060 tie bar n 8 0 1 80 600 81060 23 1 Reducing plug 1 1 4 3 4 1 60 110 10061 24 4 Plug 1 1 4 with square hole fig 596 1 60 100 30010 25 2 Eye bolt 1 80 121 10063 26 acc...

Page 19: ...uted airincludingcorrosiveelementssuch as chlorine fluorine sulphur etc The use of water which is found to be unsuitable would also invalidate our guarantee 2 Our guarantee specified below commences o...

Reviews: