
ORIVAL, INC.
• 213 S. Van Brunt St. • Englewood, NJ 07631 • (201) 568-3311
3
The rinse cycle duration is determined by a value programmed in the Controller. The
recommended programming of this value is given in the Control System manual, and
should only be changed to a different value when absolutely necessary.
Upon completion of the rinse cycle, the solenoid valve is de-energized. The solenoid
valve closes, and pressure is restored in the top chamber of the manifold via an orifice
connecting the two chambers of the manifold. Pressure is restored on the upper portion
of the rinse valve diaphragms, causing the valves to close. On hydraulic piston models,
the dirt collector assembly returns to its original position in preparation for the next rinse
cycle.
For a parallel bank of filters, one Controller is used. It monitors the inlet and outlet of the
entire system with the DPS, and each filter is rinsed sequentially. A programmable
delay allows a pause between the rinse cycle of each filter.
Summary of Contents for OR-02-PE
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 30: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 43: ......
Page 44: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 51: ......