Zones / Rooms  

 
Pre-programmed 

 

Before commissioning the smart home system check with the Project Manager or orcomm as the system 
may have pre-configured settings to ensure fast installation and simplified maintenance.   

If the system has been pre-programmed you can move straight to the commissioning section.  

 

Hidden Engineer Menu 

 

Select  

 

Press and hold for 5 seconds the top right corner (hidden access page)  

             

 

  

 

NOTE: the hidden area will time out if the screen is not touched for a period.  

 

 

Info: Network information only 

Zone: Setup area for Zone / Rooms  

Advanced: Extra installer settings (require password)  

Hidden menu is designed for quick information or 
amending room details.  

Ideally accessible by installer or competent persons 

Summary of Contents for ORC-10T-BL-N

Page 1: ...ct information Links 2 Touch Screen 3 Heating Enabled 3 Heating not Enabled 3 Zones Rooms 4 Pre programmed 4 Hidden Engineer Menu 4 New Zone Room 5 Commissioning 6 ORC HC2 Room Thermostat 6 Heating Te...

Page 2: ...or program software Note Typical installations using the Master Gateway will not need direct programming Models ORC HAGW Gateway Extensions Orcomm offer multiple Extension modules Depending on output...

Page 3: ...your system not have Heating Control enabled on the screen then follow the below steps Door Entry Door Entry Lighting Step 1 Connect any PC to the network and enter IP address or if concierge installe...

Page 4: ...can move straight to the commissioning section Hidden Engineer Menu Select Press and hold for 5 seconds the top right corner hidden access page NOTE the hidden area will time out if the screen is not...

Page 5: ...To add new room Enter hidden menu section Select More from main page Hold top corner for 5 seconds 1 Select Zones 2 Select Setup 3 Select Add New Zone 4 Complete new room details then Save Then Exit b...

Page 6: ...check the mechanical equipment has changed state Once active set degrees to minimum and check mechanical equipment Modbus Address test To test and ensure the TRC is set to correct Modbus ID follow ORC...

Page 7: ...ment has changed state Once active set degrees to maximum and check mechanical equipment Modbus Address test To test and ensure the TRC is set to correct Modbus ID follow ORC HC2 instructions To enter...

Page 8: ...idden menu on TRC Press power to turn off Then press M followed with Clock Fan then release after 3 seconds or when screen changes Then press M till you reach option 1 and the number displayed in larg...

Page 9: ...low below To change offset value in hidden menu section Select More from main page Hold top corner for 5 seconds 1 Select Zones 2 Select Setup 3 Select Devices 4 Click on Thermostat 4 Change values fo...

Page 10: ...controls room thermostats Gateway and Extension Modules https www orcomm co uk product category products home control heating controls din controllers Touch Screens https www orcomm co uk product cate...

Reviews: