background image

 

ORBINOX reserves the right to change specifications without notice. 

ORBINOX CANADA, ORBINOX USA, ORBINOX SPAIN, ORBINOX UK, ORBINOX FRANCE, ORBINOX GERMANY, ORBINOX INDIA, ORBINOX CHINA 

WWW.ORBINOX.COM 

OBXC 05-2010 

12 

05-2010 Edition 
Revision - 

INSTALLATION, OPERATION AND MAINTENANCE MANUAL 

 

MODEL 

RB

 WEIR GATES 

 

MAINTENANCE: CLEANING AND LUBRICATION 

Orbinox  model  RB  weir  gates  need  practically  no  maintenance.  In  order  to  assure  maximum  per-
formance of the weir gate,  the following maintenance inspections shall be carried out periodically 
(every 6 months):

 

Stem and stem nut shall  be cleaned and greased. In some configurations, the stem may be in 
contact with water and dirt. Under these conditions, the threads of the stem and/or stem nut may 
wear, and they shall be checked every 3 months. 

Clean  the  gate  with  clear  water  and  remove  any  deposits,  especially  on  the  seals  and  in  the 
guides. 

Check the seals and make sure they are not damaged. Seals shall be replaced if damaged. See 
section „Maintenance: Seal Replacement‟ for detailed procedures about seal replacement.  

Seals shall be wet while operating. If the weir gate has not been used for a long period of time 
under dry conditions, the seals shall be wetted with clear water before operating the weir gate. 
Operating the gate with dry seals may damage the seals. Additionally, more torque may be re-
quired to operate the weir gate.  

Spare parts: 

Orbinox does not recommend stocking any spare parts by the owner of the equipment as the weir 
gates are designed for a very long life cycle. If a repair part is required, please contact an Orbinox 
representative and provide the following information: 

Orbinox S/O number. 

“Orbinox General Arrangement Drawing” number. 

Project name (if applicable). 

Vendor‟s company name. 

Materials needed for maintenance and seal replacement: 

Material 

Type 

Recommended or equivalent 

Grease 

Silica-Gel Silicone Grease 

Verkosil G-2 

Glue 

Instant adhesive 

Loctite 495 

Summary of Contents for RB Weir Gate

Page 1: ...Installation Operation and Maintenance Manual RB Weir Gate...

Page 2: ...LATION OPERATION AND MAINTENANCE MANUAL MODEL RB WEIR GATES INDEX Introduction Handling and Storage Installation Weir Gate installation Concrete Wall Mounted Concrete Round Manhole Wall Mounted Wall T...

Page 3: ...y the customer prior to the production of the weir gate Orbinox as sumes no responsibility or liability if the slide gate is not installed operated and maintained in strict accordance to the procedure...

Page 4: ...truction sealant shall be used Sikabond Construction Sealant or equivalent 200ml per meter of opening perimeter The following table gives a general description of the required anchor bolt types for th...

Page 5: ...ncrete construction shall be flat level and plumb and shall be in accordance to ACI 117 06 standard If necessary use non shrink grout in order to meet the specified standard Concrete wall surface shal...

Page 6: ...ant application Sikabond or equivalent In order to avoid leakage between the frame and the wall construction sealant shall be applied on the frame Remove the weir gate from the wall first remove the n...

Page 7: ...ll and install the rest of the anchor bolts see Figure 5 CAUTION If the weir gate is not completely in contact with the wall do not over tighten the an chor bolts Over tightening may bend or distort t...

Page 8: ...ll be used Sikabond Con struction Sealant or equivalent 200ml per meter of opening perimeter For detailed information about the size and quantity of the required bolts or any other specific installati...

Page 9: ...2 Insert all stem guides from the top of the stem extension when applicable Align stem extension and especially make sure that it is aligned with the vertical axis of the opening see Figure 7 The maxi...

Page 10: ...A ORBINOX SPAIN ORBINOX UK ORBINOX FRANCE ORBINOX GERMANY ORBINOX INDIA ORBINOX CHINA WWW ORBINOX COM OBXC 05 2010 10 05 2010 Edition Revision INSTALLATION OPERATION AND MAINTENANCE MANUAL MODEL RB WE...

Page 11: ...tion before cycling the weir gate Manu ally open the gate approximately 5 before the initial electric motor operation Check the motor rotation to assure proper direction of the slide travel according...

Page 12: ...and in the guides Check the seals and make sure they are not damaged Seals shall be replaced if damaged See section Maintenance Seal Replacement for detailed procedures about seal replacement Seals s...

Page 13: ...s item 4 UHMWPE guides item 5 and frame Proceed with caution as major components of the gate are no longer se cured Step 3 Remove frame guides item 4 UHMWPE guides item 5 slide item 7 yoke item 6 and...

Page 14: ...DA ORBINOX USA ORBINOX SPAIN ORBINOX UK ORBINOX FRANCE ORBINOX GERMANY ORBINOX INDIA ORBINOX CHINA WWW ORBINOX COM OBXC 05 2010 14 05 2010 Edition Revision INSTALLATION OPERATION AND MAINTENANCE MANUA...

Page 15: ...MAINTENANCE SEAL REPLACEMENT 49 X49 TO 80 X80 Step 1 Start from the open position Step 2 Unscrew bolts item 1 with caution as the slide is no longer secured Step 3 Unscrew bolts and nuts items 10 and...

Page 16: ...ADA ORBINOX USA ORBINOX SPAIN ORBINOX UK ORBINOX FRANCE ORBINOX GERMANY ORBINOX INDIA ORBINOX CHINA WWW ORBINOX COM OBXC 05 2010 16 05 2010 Edition Revision INSTALLATION OPERATION AND MAINTENANCE MANU...

Page 17: ...install the weir gate clean the wall and apply a new layer of construction sealant Loose anchor bolts Tighten anchor bolts Incorrect anchor bolts Check the General Arrangement Drawing and make sure th...

Reviews: