8
Technical data
Working.Pressure:.
150.-.800.kPa.
Flow-rate.at.300.kPa:.
0.2.l/s
Pressure.loss:..
240.kPa.at.flow.of.0.1.l/s
Noise.class:.
I.(ISO.3822)
Battery:.
Lithium.2CR5.6V
Protection.class:.
IP.45
Hot.water.supply:..
max..70°C
Max..flow.period:..
preset.3.min,.range.1.s.-.60.min
ON/OFF.range.
0.-.5.cm
Recognition.range:.
preset.60.cm,.range.30.-.70.cm
Afterflow.period:.
preset.5.s,.range.0.-.255.s
General
This.Electra.Installation.and.Maintenance.Guide.introduces.the.operation,.installation.and.use.of.shower..
Please.read.the.instructions.carefully.prior.to.installation.and.save.them.for.reference.where.servicing.may.
be.needed..If.any.fault.or.malfunction.occurs.in.the.faucet,.please.seek.the.best.possible.advice.at.an.
expert.HVAC.store.
Installation (figure1)
6660A, installation casing for product 6660
–. Attach.the.installation.casing.(1).so.that.the.distance.between.the.bottom.of.the.casing.and..the.final.. .
. wall.surface.is.65-85.mm..
–. Place.the.sealing.(2).over.the.casing..It.will.lie.under.the.final.surface.material.
–. Connect.the.water.inlet.to.the.G.1/2.connection.nipple.(3).
–. Flush.the.piping.by.opening.the.ball.stop.valve.(4).
NOTE!
The.inlet.pipe.ahead.of.the.flusher.must.be.equipped.with.a.stop.valve..
–. Finally,.attach.the.installation.casing.cover.(6).ahead.of.any.construction.work.
6660C
Cover plate installation (figures 1, 2 )
–. Remove.the.installation.casing.cover.(6).
–. Make.sure.that.shower’s.own.stop.valve.(4).is.in.the.open.position.and.that.the.stop.valve..
. ahead.of.the.flusher.is.closed.
–. The.edge.of.the.installation.casing.must.be.level.with.the.final.wall.surface..If.necessary,.cut.the..
.
. casing.edge.back.
–. Detach.the.flushing.cover.(7).
–. Set.the.O-ring.(8).in.place..Make.sure.that.the.groove.is.clean.
–. Position.the.sleeve.and.litter.filter.(9).in.place.
–.. Position.the.solenoid.valve.package.(10).in.place.and.do.up.the.screws.(20).
–.. Attach.the.cover.plate.installation.frame.(11).to.the.flusher.body.with.the.four.screws.provided.(23)...
.
. Secure.the.installation.frame.to.the.wall.with.sealing.compound.!
–.. Attach.connectors.12.&.14.to.each.other.
–.. Correctly.position.the.cover.plate.(16).and.do.up.the.screws.(17).
–. Open.the.water.inlet.to.the.flusher.and.peel.off.the.tape.from.the.sensor.
Changing the factory settings
Recognition.range.and.afterflow.period.are.factory.preset.and.can.be.modified.with.Oras.Data.Terminal..The.
Data.Terminal.can.also.be.used.to.collect.data.from.the.faucet.to.plan.any.necessary.servicing..Please.seek.
the.best.possible.advice.at.an.expert.HVAC.store.
GB
Summary of Contents for Electra 6660
Page 1: ...Installation and Maintenance Guide Oras Electra ...
Page 2: ......
Page 4: ... 7 6 1 3 2 15 4 6660 1 ...
Page 5: ... 17 16 12 23 11 14 24 21 22 9 20 12 18 19 10 8 2 ...
Page 27: ......