INSTALLATION
9.2
Installation site
The appliance is exclusively designed for installation on a solid wall. Ensure the wall offers adequate load
bearing capacity.
Always install the appliance vertically in a room free from the risk of frost.
26
�0
2�
06
�0
13
6
E
35
°C
85
The water connections point upwards.
The colour coding of the faucet connection pipes and the water heater must match:
R.h. side blue
=
Cold water connection
L.h. side red
=
DHW connection
9.3
Installation
9.3.1 Fitting the wall mounting bracket
»
Mark out the holes for drilling as indicated on the dimensioned drawing.
»
Drill the two holes and insert rawl plugs.
»
Secure the wall mounting bracket with suitable screws.
9.3.2 Installing the appliance
»
Hang the appliance onto the wall mounting bracket.
»
Secure the water connections from the faucet to the appliance.
»
Set a maximum flow rate of 5 l/min (see faucet instructions).
10
COMMISSIONING
10.1
Initial start-up
Danger of electrocution!
Commissioning must only be carried out by a qualified contractor in accordance with
safety regulations.
!
Boil dry risk
If the correct order (first water, then power) is inverted, the
high limit safety cut-out will respond.
If this occurs, vent the appliance again and briefly disconnect from the power supply.