
Outdoor Use Please Consult NEC Codes in Your Region.
Outdoor installations may require an in-use weather cover if they are exposed to damp,
wet, or other exposed environments. Confirm requirements with applicable codes
before operation.
Step 3: Energise Outlet
After completing the installation, you can return to the breaker panel to energize the
circuit breaker. If everything was connected property, you should know the LED ring
should turn on and breathe deep blue. This way takes 2-5 minutes for a cellular
connection to be made.
Copyrights Orange Charger Inc 2022