![Oracle Tekelec 1200 Installation Manual Download Page 50](http://html1.mh-extra.com/html/oracle/tekelec-1200/tekelec-1200_installation-manual_1646178050.webp)
Figure 23: Mark Floor Layout
Raised Floor Installation
Use the procedures in this section to prepare floors for anchoring cabinets on raised flooring. For this
type of installation, you must create cable and anchor holes in the raised floor tiles.
The procedure for preparing raised flooring is highly site specific. For more information, refer to the
site specific specification as per the Method Of Procedure (MOP) for the particular installation.
Warning: Before drilling holes in any flooring, verify with facilities personnel that the
area will support a loaded cabinet and is free of gas or water pipes, ventilation ducts,
electrical wiring conduits, or any other items that may be damaged. If the hole is drilled
at an angle the anchor and cabinet will not come together properly. After marking anchor
locations, remove the tiles and take them to an approved location for drilling. Do not
drill tiles in the equipment area.
Recommended Tools and Materials
Tekelec tools should be labeled “Property of TEKELEC” with either a press-on Field Tool Identification
label or Field Tool Identification wrap.
• Safety glasses
• Ear protectors
• Rotary impact drill
• 18 mm masonry drill-bit
• 1-inch drill-bit (hole saw)
• Fiberglass tape measure
• Extension cord
• Vacuum cleaner (an approved, industrial type, that prevents escaping dust particles that may
contaminate electronic equipment)
50
910-5681-001 Revision E, February 2014
Cabinet Installation
Installation