background image

 

Original Publication Date: 

Nov 1, 2019 

 

 

 

Oracle Talari E500 

Hardware Guide 

Summary of Contents for Talari E500

Page 1: ...Original Publication Date Nov 1 2019 Oracle Talari E500 Hardware Guide ...

Page 2: ...grams No other rights are granted to the U S Government This software or hardware is developed for general use in a variety of information management applications It is not developed or intended for use in any inherently dangerous applications including applications that may create a risk of personal injury If you use this software or hardware in dangerous applications then you shall be responsibl...

Page 3: ...e 9 Unpacking and Inspection 9 Rack Mounting 9 Safety Recommendations 9 LAN WAN Connections 9 Important Note About Cabling and Bypass Mode 9 Powering Up the Appliance 10 Network Deployment Options 11 E500 as a Router Gateway Fail to Block 11 E500 as Layer 2 Fail To Wire Overlay 11 E500 with MPLS Internet Hybrid 11 Other Options 11 Deploying the E500 APN Appliance 12 Easy 1st Install 12 Site Deploy...

Page 4: ...ork Operator My Oracle Support My Oracle Support https support oracle com is your initial point of contact for all product support and training needs A representative at Customer Access Support CAS can assist you with My Oracle Support registration Call the CAS main number at 1 800 223 1711 toll free in the US or call the Oracle Support hotline for your local country from the list at http www orac...

Page 5: ... registration or assistance with My Oracle Support select 2 You are connected to a live agent who can assist you with My Oracle Support registration and opening a support ticket My Oracle Support is available 24 hours a day 7 days a week 365 days a year Emergency Response In the event of a critical service situation emergency response is offered by the Customer Access Support CAS main number at 1 ...

Page 6: ... maintenance capabilities and requires immediate corrective action Critical situations affect service and or system operation resulting in one or several of these situations A total system failure that results in loss of all transaction processing capability Significant reduction in system capacity or traffic handling capability Loss of the system s ability to perform automatic system reconfigurat...

Page 7: ...on the Oracle Help Center Site Oracle Communications customer documentation is available on the web at the Oracle Help Center OHC site http docs oracle com You do not have to register to access these documents Viewing these files requires Adobe Acrobat Reader which can be downloaded at http www adobe com 1 Access the Oracle Help Center site at http docs oracle com 2 Click Industries 3 Click the Or...

Page 8: ...a file to your location right click the PDF link select Save target as or similar command based on your browser and save to a local folder Reference Documents The following documents are available Talari APN Glossary Talari APN Appliance E500 Installation Guide Talari APN Appliance Quick Start Guide ...

Page 9: ...quire a standard 19 inch 480mm two post rack for mounting Software The Talari Web Console is supported in latest versions of the following web browsers Microsoft IE9 IE11 Mozilla Firefox Google Chrome Supported browsers must have cookies enabled Supported browsers must have JavaScript installed and enabled Display A minimum screen resolution of 1024 x 960 or greater is recommended 5 ...

Page 10: ... and reliability at consumer prices Talari APN Appliances APNAs are seamlessly added to existing networks to deliver more bandwidth reduced WAN operating expenses and greater reliability than any existing single provider WAN Using our patented Adaptive Private Network technology Talari s solution combines diverse abundant affordable IP bandwidth sources and provides reliable resilient and high qua...

Page 11: ... Panel Configuration Power A C Power Connector Port 1 Gigabit Ethernet Bypass pair with Port 2 Port 2 Gigabit Ethernet Bypass pair with Port 1 Port 3 Gigabit Ethernet Bypass pair with Port 4 Port 4 Gigabit Ethernet Bypass pair with Port 3 Console DB9 console port 115200 8 N 1 Port 5 Auxiliary management port used for Manual Install Management Management port USB Ports 2 USB 2 0 Ports X1 X4 Gigabit...

Page 12: ...Activity LED Flashing Yellow Network Activity Ethernet Link Status LED Off 10 Mbps or No Connection Green 100 Mbps Yellow 1000 Mbps 7 ...

Page 13: ...ront Panel Power Disk SSD Activity Temp System Overheat Bypass 2x Link LEDs Rear Panel Link Activity Link Speed Buttons Front Panel Power On Off button System Reset button Operating Temperature 32 F to 140 F 0 to 60 C Storage Temperature 40 F to 140 F 40 C to 60 C Humidity Range 8 to 90 non condensing operating environment 5 to 95 non condensing storage environment Capacity 10 individual Gigabit E...

Page 14: ...ke sure the rack is level and stable before pulling a device out of the rack Do not move racks by yourself at least two people are recommended to move a rack Cables should be easily identifiable LAN WAN Connections When connecting each Ethernet cable LAN WAN to the appropriate connector on the E500 Position the cables carefully so that they do not put strain on the connectors Organize cables in bu...

Page 15: ...ting and verifying this capability with the Talari appliance powered off for proper operation For assistance please contact your Talari representative or the Talari Support team Powering Up the Appliance When connecting power to the E500 Plug the AC power cord into the appliance Plug the AC power cord into an uninterrupted AC power source The appliance will start automatically The E500 uses 120 24...

Page 16: ... Description The E500 is deployed on the LAN side of the gateway and bypass pairs are configured as Fail To Wire Use this option if you prefer to retain existing edge devices or plan to install an alternative edge device on the WAN side of the Talari Appliance Proceed to the pages below based on your installation method Easy 1st Install Page 12 Manual Install Page 14 E500 with MPLS Internet Hybrid...

Page 17: ... the Web Console of the NCN 2 Navigate to Configuration Easy Install 3 Locate the Site name of the E500 being deployed 4 Click the Edit pencil to open the Set Serial Number window 5 Enter the serial number of the E500 being deployed and click the Set Serial Number button The serial number may be located on the read panel of the appliance 6 Observe the Upload Activate column Click the Upload Activa...

Page 18: ...Oracle Talari E500 Hardware Guide 6 To access the Management IP address of the E500 via the conduit after deployment is complete move the blue management cable to the LAN switch 1 3 ...

Page 19: ... on site user who will be deploying the appliance Deploying the Talari Appliance 1 Connect the power cord to the E500 Connect the other end to an appropriately grounded power source The E500 will power on automatically 2 Connect your PC directly to the port 5 of the E500 3 From the PC connected to the Talari a Change the IP address of your PC to 192 168 0 1 b Change the Subnet Mask of your PC to 2...

Page 20: ...Fail to Wire The E500 APNA is equipped with a capability known as Inline mode with the interfaces in Fail to Wire This capability is designed to prevent a single point of failure If there is a serious problem with the E500 APNA the bypass pair goes into bypass mode and forwards traffic through as though the appliance were a wire Interfaces may be configured as either Fail to Wire or Fail to Block ...

Page 21: ...Oracle Talari E500 Hardware Guide 1 6 ...

Page 22: ......

Reviews: