![Oracle Sun Datacenter InfiniBand Switch 648 Installation Manual Download Page 127](http://html1.mh-extra.com/html/oracle/sun-datacenter-infiniband-switch-648/sun-datacenter-infiniband-switch-648_installation-manual_1646261127.webp)
Installing the Switch
117
3. Consider your next step:
■
(Optional) Display and record the InfiniBand cable FRU ID information.
See
“Identify the CXP Connector Addresses” on page 117
.
■
Interface with the InfiniBand software stack.
See
“Discover the InfiniBand Fabric Topology” on page 120
Related Information
■
Switch Administration
, checking status LEDs
■
Switch Command Reference
,
checklinks
command
■
“Attach Cables to the CXP Connectors” on page 109
■
“Verify the CMC Status” on page 86
■
“Verify the Power Supply Status” on page 89
■
“Verify the Fabric Card Status” on page 97
■
“Verify the Line Card Status” on page 104
▼
Identify the CXP Connector Addresses
1. Identify the prerequisite and subsequent tasks you must perform in
conjunction with this procedure, to install the switch.
See the table in
“Installation Sequence” on page 20
2. Use this table to provide the IPMB address FRU number for a particular CXP
connector in a line card.
Connector
Number
IPMB Address
FRU Number
Connector
Number
IPMB Address
FRU Number
Connector
Number
IPMB Address
FRU Number
0A
2
4A
10
8A
18
0B
1
4B
9
8B
17
1A
4
5A
12
9A
20
1B
3
5B
11
9B
19
2A
6
6A
14
10A
22
2B
5
6B
13
10B
21
3A
8
7A
16
11A
24
3B
7
7B
15
11B
23