2
Install the Library
The SL150 library installs into a standard 19-inch rack. You must install the Base
Module first, and then install any Expansion Modules below it.
Note:
These installation instructions use the Sun Rack II (a standard Oracle 19-
inch rack). If your rack is different, use the instructions as a basic guide but
alter the steps accordingly.
Library installation involves the following tasks:
•
Verify the Site Meets Environmental Requirements
•
•
Unpack and Acclimate the Library
•
•
•
Install Power Supplies and Tape Drives
•
•
•
•
Configure the Library After Powering-on for the First Time
•
Verify the Site Meets Environmental Requirements
Make sure the site meets environmental requirements to prevent equipment damage.
•
Temperature and Humidity Limits
•
•
Positive Pressurization and Ventilation - Hot Aisle Containment System (HACS)
•
Temperature and Humidity Limits
To increase reliability and prevent equipment damage, maintain the environment
between the recommended temperature and humidity ranges.
Temperature:
2-1