Verify a NVMe Switch Card
Using the screw provided with the NVMe kit, secure the cable clamp to the board, then tuck the
NVMe cable into the cable clamp.
3.
Install the main module.
See
“Install the Main Module” on page 102
.
Verify a NVMe Switch Card
1.
Use the Oracle ILOM fault management shell to determine if the replacement
NVMe switch card is shown as enabled or disabled:
114
SPARC T8-4 Server Service Manual • January 2022
Summary of Contents for SPARC T8-4
Page 1: ...SPARC T8 4 Server Service Manual Part No E80512 05 January 2022 ...
Page 2: ......
Page 10: ...10 SPARC T8 4 Server Service Manual January 2022 ...
Page 12: ...12 SPARC T8 4 Server Service Manual January 2022 ...
Page 24: ...24 SPARC T8 4 Server Service Manual January 2022 ...
Page 42: ...42 SPARC T8 4 Server Service Manual January 2022 ...
Page 116: ...116 SPARC T8 4 Server Service Manual January 2022 ...
Page 134: ...134 SPARC T8 4 Server Service Manual January 2022 ...
Page 154: ...154 SPARC T8 4 Server Service Manual January 2022 ...
Page 190: ...190 SPARC T8 4 Server Service Manual January 2022 ...
Page 198: ...198 SPARC T8 4 Server Service Manual January 2022 ...
Page 204: ...204 SPARC T8 4 Server Service Manual January 2022 ...