Connecting Cables
These tasks describe how to connect cables before you attempt to boot the server.
Step
Description
Links
1.
Review the cabling requirements.
“Cabling Requirements” on page 51
2.
Review the front and rear panel connectors and ports.
“Front Panel Components (Installation)” on page 12
“Rear Panel Components (Installation)” on page 13
“Identifying Ports” on page 52
3.
Connect the management and data cables.
“Connecting Data and Management Cables” on page 58
4.
Secure the cables to the CMA.
“Secure Cables to the CMA” on page 62
“Verify Operation of Slide Rails and CMA” on page 47
Related Information
■
“Rear Panel Components (Installation)” on page 13
■
“Installing the Server” on page 25
■
“Powering On the Server for the First Time” on page 65
Cabling Requirements
Prior to cabling and powering on the server, gather the following network information:
■
Netmask
■
IP address for the SP
■
Gateway IP address
At a minimum, you must connect cables to these ports before powering-on the server for the
first time:
Connecting Cables
51
Summary of Contents for SPARC T7-1
Page 1: ...SPARC T7 1 Server Installation Guide Part No E54979 01 October 2015 ...
Page 2: ......
Page 8: ...8 SPARC T7 1 Server Installation Guide October 2015 ...
Page 20: ...20 SPARC T7 1 Server Installation Guide October 2015 ...
Page 50: ...50 SPARC T7 1 Server Installation Guide October 2015 ...
Page 64: ...64 SPARC T7 1 Server Installation Guide October 2015 ...
Page 84: ...84 SPARC T7 1 Server Installation Guide October 2015 ...