Preparing for Installation
These topics detail the precautions to follow and the tools to assemble prior to installing the
server.
Step
Description
Links
1.
Confirm that you received all the items you ordered.
2.
Review safety and ESD precautions
“Handling Precautions” on page 23
3.
Verify that you have the correct tools.
“Tools Needed for Installation” on page 24
Related Information
■
“Installing the Server” on page 25
■
“Connecting Cables” on page 51
■
“Powering On the Server for the First Time” on page 65
Shipping Kit
Note -
When you receive your server, place it in the environment where you will install it.
Leave it in its shipping crate at its final destination for 24 hours. This resting period prevents
thermal shock and condensation.
Verify that you received all of the components that ship with your server.
Preparing for Installation
21
Summary of Contents for SPARC T7-1
Page 1: ...SPARC T7 1 Server Installation Guide Part No E54979 01 October 2015 ...
Page 2: ......
Page 8: ...8 SPARC T7 1 Server Installation Guide October 2015 ...
Page 20: ...20 SPARC T7 1 Server Installation Guide October 2015 ...
Page 50: ...50 SPARC T7 1 Server Installation Guide October 2015 ...
Page 64: ...64 SPARC T7 1 Server Installation Guide October 2015 ...
Page 84: ...84 SPARC T7 1 Server Installation Guide October 2015 ...