Preparing the Site
39
To prevent catastrophic failures, design your input power sources to ensure that
adequate power is provided to the server. Use dedicated circuit breakers for all
power circuits that supply power to the server.
Electrical work and installations must comply with applicable local, state, or national
electrical codes. Contact your facilities manager or a qualified electrician to
determine what type of power is supplied to your building.
Caution –
To protect your server from electrical fluctuations and interruptions, use
a dedicated power distribution system, uninterruptible power supplies, power
conditioning equipment, and lightning arresters.
The three-phase AC power source must be a center-point grounded star
configuration (type TN-C per IEC 60950). The server operates phase-to-phase, so the
neutral line of the 5-wire power cord is not connected. Only the three phase wires
and the ground wire connect to the AC power distribution.
Summary of Contents for sparc M5-32
Page 1: ...SPARC M5 32 and SPARC M6 32 Servers Installation Guide Part No E41215 05 December 2014 ...
Page 8: ...viii SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 16: ...6 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Front Components ...
Page 18: ...8 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Rear Components ...
Page 21: ...Understanding the Server 11 FIGURE DCU Locations Rear of Server ...
Page 51: ...Preparing the Site 41 ...
Page 82: ...72 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 106: ...96 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 182: ...172 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...