Summary of Contents for Netra SPARC S7-2

Page 1: ...Netra SPARC S7 2 Server Installation Guide Part No E73206 03 January 2017 ...

Page 2: ......

Page 3: ...angerous applications including applications that may create a risk of personal injury If you use this software or hardware in dangerous applications then you shall be responsible to take all appropriate fail safe backup redundancy and other measures to ensure its safe use Oracle Corporation and its affiliates disclaim any liability for any damages caused by use of this software or hardware in dan...

Page 4: ...s à risque notamment dans des applications pouvant causer des dommages corporels Si vous utilisez ce logiciel ou matériel dans le cadre d applications dangereuses il est de votre responsabilité de prendre toutes les mesures de secours de sauvegarde de redondance et autres mesures nécessaires à son utilisation dans des conditions optimales de sécurité Oracle Corporation et ses affiliés déclinent to...

Page 5: ...ical Specifications 18 Input Power Information 19 Overcurrent Protection Requirements 20 DC Power Source Power Connection and Grounding Requirements 21 Environmental Requirements 22 Acoustic Noise Emissions 23 Airflow Precautions 24 Preparing for Installation 27 Shipping Kit Inventory 27 Handling Precautions 28 ESD Precautions 29 Tools Needed for Installation 29 Installing the Server 31 Optional C...

Page 6: ...le the SP 64 Cable the Ethernet Ports 64 Connect Other Data Cables 65 Identifying Ports 65 SER MGT Port 66 NET MGT Port 67 10 Gigabit Ethernet Ports 68 USB Ports 69 Powering On the Server for the First Time 71 Connect the Chassis Ground Wire 72 Connect AC Power Cords 74 Assembling and Connecting DC Power Cords 75 Assemble the DC Input Power Cords 76 Connect DC Power Source 80 Connect a Terminal or...

Page 7: ...Contents Assign a Static IP Address to the NET MGT Port 92 Oracle Auto Service Request Software Activation 94 Index 97 7 ...

Page 8: ...8 Netra SPARC S7 2 Server Installation Guide January 2017 ...

Page 9: ...ystem administrators and authorized service providers Required knowledge Experience installing hardware Product Documentation Library Documentation and resources for this product and related products are available at http www oracle com goto netra s7 2 docs Feedback Provide feedback about this documentation at http www oracle com goto docfeedback Using This Documentation 9 ...

Page 10: ...10 Netra SPARC S7 2 Server Installation Guide January 2017 ...

Page 11: ...es on page 61 Powering On the Server for the First Time on page 71 Installation Task Overview Perform the following tasks to install and configure the server Step Description Links 1 Review the product notes for any late breaking news about the server Netra SPARC S7 2 Server Product Notes 2 Review the server features and familiarize yourself with the server components Server Overview on page 12 Fr...

Page 12: ...n the Server for the First Time on page 71 Related Information Server Overview on page 12 Front Panel Components Installation on page 14 Rear Panel Components Installation on page 15 Netra SPARC S7 2 Server Service Manual Server Overview The server is a carrier grade NEBS certified 2U server This table summarizes the server s components For detailed information about the server s features go to ht...

Page 13: ...s however the electrical max remains x8 up to 25 watts per card All PCIe expansion slots support PCIe 3 0 Gen3 PCIe3 signaling levels PCIe internal HBA card Optional One internal SAS HBA PCIe controller card USB ports Two front 2 0 USB ports and one rear 3 0 USB port eUSB flash drive One internal eUSB drive Indicators and switches Power button switch Locate button switch with integrated LED System...

Page 14: ...ED Major LED Minor LED User LED Interpreting LEDs in Netra SPARC S7 2 Server Service Manual 2 Locate button Rear Panel LEDs in Netra SPARC S7 2 Server Service Manual 3 and 4 Eight SAS drive slots of which four can be used as NMVe slots Servicing SAS Drives in Netra SPARC S7 2 Server Service Manual 5 Two USB 2 0 ports USB Ports on page 69 6 Serial number and manufacturing information Find the Serve...

Page 15: ...swappable power supply AC or DC PS0 Servicing Power Supplies in Netra SPARC S7 2 Server Service Manual 3 PCIe slots Servicing PCIe Cards in Netra SPARC S7 2 Server Service Manual 4 Grounding studs Connect the Chassis Ground Wire on page 72 5 USB 3 0 port USB Ports on page 69 6 Four 10 Gigabit Ethernet ports NET 3 NET 2 NET 1 NET 0 10 Gigabit Ethernet Ports on page 68 7 NET MGT port NET MGT Port on...

Page 16: ...ce Required LED Main Power OK LED Related Information Installation Task Overview on page 11 Server Overview on page 12 Front Panel Components Installation on page 14 Netra SPARC S7 2 Server Service Manual 16 Netra SPARC S7 2 Server Installation Guide January 2017 ...

Page 17: ...ction Requirements on page 20 Environmental Requirements on page 22 Acoustic Noise Emissions on page 23 Airflow Precautions on page 24 Related Information Understanding the Server on page 11 Preparing for Installation on page 27 Installing the Server on page 31 Connecting Cables on page 61 Powering On the Server for the First Time on page 71 Physical Specifications Description U S Metric Rack unit...

Page 18: ...rmation on page 19 DC Power Source Power Connection and Grounding Requirements on page 21 Overcurrent Protection Requirements on page 20 Environmental Requirements on page 22 Acoustic Noise Emissions on page 23 Airflow Precautions on page 24 Electrical Specifications The values in this table are for the power supplies Use the online power calculator to determine the power consumption of a server w...

Page 19: ...iring that is grounded at both ends except the ethernet ports Caution Mixing power supply types AC and DC is not allowed Related Information Physical Specifications on page 17 Input Power Information on page 19 DC Power Source Power Connection and Grounding Requirements on page 21 Overcurrent Protection Requirements on page 20 Environmental Requirements on page 22 Acoustic Noise Emissions on page ...

Page 20: ...uits that have overcurrent protection as defined by Article 240 of the U S NEC Product power inputs with a current ratings of 16A or less must have a branch circuit or a supplementary overcurrent protection device rated at no more than 20A Product power inputs with current rating of more than 16A must have a branch circuit or a supplementary overcurrent protection device rated at no more than 160 ...

Page 21: ...led in a restricted access location According to the intent of the U S NEC a restricted access location is an area intended for qualified or trained personnel only and has access controlled by a locking mechanism such as a key lock or an access card system Caution The DC power source must be reliably grounded The server chassis must be grounded with the power supply ground pins or with the chassis...

Page 22: ...etardant insulation might be required in some installations Use mating connectors for proper connection to the product DC inputs Connectors are included in the server s shipping kit Branch circuit cable insulation color According to applicable national electrical codes DC power source must meet TNV 2 requirements as defined by UL 60950 1 and IEC 60950 1 Related Information Physical Specifications ...

Page 23: ...ation NEBS requirement 60 meters to 1800 meters 200 feet to 5905 feet at 40 C 104 F 1800 meters to 4000 meters 5905 feet to 13 123 feet at 30 C 86 F Up to 12 000 meters 39 370 feet Does not apply to removable media devices Maximum ambient operating temperature is derated by 1 C per 500m elevation Related Information Physical Specifications on page 17 Electrical Specifications on page 18 Input Powe...

Page 24: ...in a safe operating range Air flows from the front to the rear of the server Follow these guidelines to ensure unrestricted airflow in the server Adhere to the minimum airflow clearance specifications See Physical Specifications on page 17 Install the server so the front faces the cool aisle and the rear faces the warm aisle Do not direct warm air into the server Prevent recirculation of air withi...

Page 25: ...rical Specifications on page 18 Input Power Information on page 19 DC Power Source Power Connection and Grounding Requirements on page 21 Overcurrent Protection Requirements on page 20 Environmental Requirements on page 22 Airflow Precautions on page 24 Confirming Specifications 25 ...

Page 26: ...26 Netra SPARC S7 2 Server Installation Guide January 2017 ...

Page 27: ...ting Cables on page 61 Powering On the Server for the First Time on page 71 Shipping Kit Inventory Standard system components are installed at the factory Options such as a PCIe cards or a monitor are shipped separately Note Inspect the shipping cartons for evidence of physical damage If a shipping carton appears damaged request that the carrier s agent be present when the carton is opened Keep al...

Page 28: ...lation on page 29 Rack Cautions on page 32 Stabilize the Rack on page 33 Handling Precautions Caution Deploy the antitilt bar on the equipment rack before beginning an installation Caution The server is heavy Two people are required to lift and mount this server into a rack enclosure when using the procedures in this document See Physical Specifications on page 17 Caution When completing a two per...

Page 29: ...ctrostatic damage which can permanently disable the server or require repair by service technicians place components on an antistatic surface such as an antistatic discharge mat an antistatic bag or a disposable antistatic mat Wear an antistatic grounding strap connected to a metal surface on the chassis when you work on server components Related Information Shipping Kit Inventory on page 27 Handl...

Page 30: ...erminal Workstation Terminal server Computer such as a laptop running terminal emulation software Patch panel connected to a terminal server Cables needed to connect the console device to the SER MGT port Related Information Shipping Kit Inventory on page 27 Handling Precautions on page 28 ESD Precautions on page 29 Optional Components on page 31 Rack Cautions on page 32 Stabilize the Rack on page...

Page 31: ...age 40 Installing the 19 Inch Hardmount Kit 2 Post Rack on page 51 Related Information Understanding the Server on page 11 Confirming Specifications on page 17 Preparing for Installation on page 27 Connecting Cables on page 61 Powering On the Server for the First Time on page 71 Optional Components Optional components such as additional memory or PCIe cards that were ordered as part of the server ...

Page 32: ...nly in an environment compatible with the Tma specified for the server Caution Reduced Air Flow Install the equipment in a rack so that the amount of air flow is adequate for the safe operation of the equipment Caution Mechanical Loading Mount the equipment in the rack so that the weight is distributed evenly A hazardous condition can exist with uneven mechanical loading Caution Circuit Overloadin...

Page 33: ...m tipping during the installation stabilize the cabinet using all antitilt mechanisms provided 3 If there are leveling feet beneath the rack cabinet to prevent it from rolling extend these leveling feet fully downward to the floor 4 Fully extend the rack cabinet s antitilt legs or antitilt bar which are located at the bottom front of the rack cabinet Related Information Documentation for your rack...

Page 34: ...onents on page 35 Install the Server 4 Post 19 Inch Hardmount Rack Kit on page 36 Related Information Tools Needed for Installation on page 29 Handling Precautions on page 28 Rack Cautions on page 32 34 Netra SPARC S7 2 Server Installation Guide January 2017 ...

Page 35: ...Stabilize the Rack 19 Inch Hardmount Kit 4 Post Rack Components No Description 1 Rear mount flanges 2 2 Screws 3 Rear mount support brackets 2 4 Hardmount brackets 2 Installing the Server 35 ...

Page 36: ...rted 1 Gather the required tools See Tools Needed for Installation on page 29 2 Read the server cautions See Handling Precautions on page 28 and ESD Precautions on page 29 3 Read the rack cautions and stabilize the rack See Rack Cautions on page 32 and Stabilize the Rack on page 33 4 If you are changing the rack kit on an existing server in your data center perform these steps a Shut down the serv...

Page 37: ...head Phillips screws for each bracket 6 Measure the depth of the rack The measurement is used in the next step 7 Install the rear mount support brackets at the rear of the server extending the rear mount support brackets to the measured depth of the rack Installing the Server 37 ...

Page 38: ... three of the supplied M4 x 0 5 x 5 mm panhead Phillips screws for each bracket depending on the rack depth 8 Lift the server to the desired location in the rack 9 Secure the front of the hardmount brackets 38 Netra SPARC S7 2 Server Installation Guide January 2017 ...

Page 39: ... Server 4 Post 19 Inch Hardmount Rack Kit Use two screws for each post 10 Secure the rear mount support brackets to the rear of the rack Use two screws for each rear mount support bracket Installing the Server 39 ...

Page 40: ...mponents on page 35 Tools Needed for Installation on page 29 Handling Precautions on page 28 Rack Cautions on page 32 Installing the 19 Inch Sliding Rail Kit With the CMA These topics describe how to install the server using the optional 19 inch sliding rail kit with the CMA 19 Inch Sliding Rail Kit With the CMA Components on page 41 Install the Server 4 Post 19 Inch Sliding Rails With CMA Rack Ki...

Page 41: ...il Kit With the CMA Components No Description 1 Threaded screw plates 4 2 Screw and nut packages 3 Cable management arm 4 Rear L brackets 2 5 Front L Brackets 2 6 Slide assemblies 2 7 Glide assemblies 2 8 Hardmount brackets 2 from standard rail kit Installing the Server 41 ...

Page 42: ...tion on page 29 2 Read the server cautions See Handling Precautions on page 28 and ESD Precautions on page 29 3 Read the rack cautions and stabilize the rack See Rack Cautions on page 32 and Stabilize the Rack on page 33 4 If you are changing the rack kit on an existing server in your data center perform these steps a Shut down the server and remove the power and data cables b Remove the server fr...

Page 43: ...t hardmount brackets to the sides of the server Use four M5 x 4 5 mm flathead Phillips screws for each side 7 Disassemble the sliding rails by pressing the release buttons and pulling the rail glides out of the sliding rails 8 Attach the rail glides to the hardmount brackets Installing the Server 43 ...

Page 44: ...er 4 Post 19 Inch Sliding Rails With CMA Rack Kit Use four M5 x 4 5 mm panhead screws for each rail glide 9 Loosely install the L brackets to the sliding rails 44 Netra SPARC S7 2 Server Installation Guide January 2017 ...

Page 45: ... With CMA Rack Kit Use four M5 x 12 mm panhead screws four flat washers four star washers and four nuts for each L bracket 10 Loosely install the threaded screw plate and cage nuts in the four posts at the appropriate height Installing the Server 45 ...

Page 46: ...te 11 Install two cage nuts used to secure the server into the rack into the two front posts Align the cage nuts with the screw holes in the hardmount bracket upper and lower The security screws go through each of the hardmount brackets and into the cage nuts mounted to the rails 46 Netra SPARC S7 2 Server Installation Guide January 2017 ...

Page 47: ...19 Inch Sliding Rails With CMA Rack Kit 12 Install the sliding rail L bracket assemblies into the threaded screw plates 13 Secure the L bracket assemblies to the posts 14 Tighten the sliding rail screws Installing the Server 47 ...

Page 48: ...hey lock open and slowly install the server into the slide assemblies 16 Press the release buttons and slide the server completely into the rack 17 Attach the right and left sides of the CMA to the rear of the slide assembly right and server left 48 Netra SPARC S7 2 Server Installation Guide January 2017 ...

Page 49: ...d handles should point inward Pull the green handles out and release it when the holes are aligned The left CMA flange fits into key hole notches on the end of the left glide rail 18 Extend the server to the service position to ensure that the CMA expands properly Installing the Server 49 ...

Page 50: ...ils With CMA Rack Kit 19 Route and secure the cables in the CMA 20 Install the security screws to secure the server into the rack Illustration is shown without the slide rails for clarity 50 Netra SPARC S7 2 Server Installation Guide January 2017 ...

Page 51: ...41 Tools Needed for Installation on page 29 Handling Precautions on page 28 Rack Cautions on page 32 Installing the 19 Inch Hardmount Kit 2 Post Rack Use these topics to install the server using an optional 19 inch hardmount rack kit into a 19 inch wide 2 post rack 19 Inch Hardmount Rack Kit 2 Post Rack Components on page 52 Install the Server 2 Post 19 Inch Hardmount Rack Kit on page 53 Related I...

Page 52: ... No Description 1 Rear plates 2 2 Screws 3 Side brackets 2 Related Information Install the Server 2 Post 19 Inch Hardmount Rack Kit on page 53 Tools Needed for Installation on page 29 Handling Precautions on page 28 Rack Cautions on page 32 52 Netra SPARC S7 2 Server Installation Guide January 2017 ...

Page 53: ...rted 1 Gather the required tools See Tools Needed for Installation on page 29 2 Read the server cautions See Handling Precautions on page 28 and ESD Precautions on page 29 3 Read the rack cautions and stabilize the rack See Rack Cautions on page 32 and Stabilize the Rack on page 33 4 If you are changing the rack kit on an existing server in your data center perform these steps a Shut down the serv...

Page 54: ...nt Rack Kit Use four M5 x 7 SEM screws for each side bracket 6 Lift the server into the rack 7 Using two screws for each bracket secure the front of the server to the front of the rack 54 Netra SPARC S7 2 Server Installation Guide January 2017 ...

Page 55: ...ntains especially high vibrations use the rear plates to further secure the server to the rack The rear plates attach to the rear of the post and to one of the three sets of eyelets on each side bracket depending on the thickness of the post a Loosely install the screws in one of the six positions on the rear plate Installing the Server 55 ...

Page 56: ...aries depending on the thickness of the rail in the rack For example this figure shows where to install the screws for the optimum rack position on the rear plate b Slide the rear plate in so that the screws slide into position into one set of the eyelets 56 Netra SPARC S7 2 Server Installation Guide January 2017 ...

Page 57: ... facing the rear of the server The other side of the rear plate should be in front of the rack post c Tighten the screws to secure the rear plate to the set of eyelets on the side bracket d Secure the other side of the rear plates to the back of the posts Installing the Server 57 ...

Page 58: ...Connect required and optional cables See Connecting Cables on page 61 10 Consider your next step For an existing server return the server to operation by following the steps in the service manual For a new server continue the installation by following the steps in this guide 58 Netra SPARC S7 2 Server Installation Guide January 2017 ...

Page 59: ...Install the Server 2 Post 19 Inch Hardmount Rack Kit Related Information Tools Needed for Installation on page 29 Handling Precautions on page 28 Rack Cautions on page 32 Installing the Server 59 ...

Page 60: ...60 Netra SPARC S7 2 Server Installation Guide January 2017 ...

Page 61: ...hernet ports Cable the Ethernet Ports on page 64 10 Gigabit Ethernet Ports on page 68 4 Optional Connect other data cables Connect Other Data Cables on page 65 USB Ports on page 69 Documentation for your PCIe cards Related Information Understanding the Server on page 11 Confirming Specifications on page 17 Preparing for Installation on page 27 Installing the Server on page 31 Powering On the Serve...

Page 62: ...connect to the outside plant or its wiring This figure and table describe available ports and lists what you need to use them No Port Description Needed 1 USB Provides USB connection to the host Additionally two USB ports are available on the front of the server USB keyboard USB mouse For pinout information see USB Ports on page 69 2 NET 0 3 Four 10 Gigabit Ethernet ports enable you to connect the...

Page 63: ...ET MGT port parameters 4 SER MGT A serial connection through an RJ 45 connector This port supports local connections to the SP and is limited to CLI interaction with Oracle ILOM These are the default settings 8N1 eight data bits no parity one stop bit 9600 baud Disable hardware flow control CTS RTS Disable software flow control XON XOFF A terminal device can be a terminal a connection to a termina...

Page 64: ...ted Information Available Connections on page 61 Cable the Ethernet Ports on page 64 Connect Other Data Cables on page 65 Identifying Ports on page 65 Rear Panel Components Installation on page 15 Cable the Ethernet Ports Once the server is running the OS these connections provide Ethernet access to the server See 10 Gigabit Ethernet Ports on page 68 Note The Oracle ILOM sideband management featur...

Page 65: ...f your installation includes optional PCIe cards USB devices or alarms make the appropriate connections to those devices Gather the cables and equipment to make these connections based on your server options PCIe cards refer to PCIe device documentation USB devices see USB Ports on page 69 Related Information Available Connections on page 61 Cable the SP on page 64 Cable the Ethernet Ports on page...

Page 66: ...ommunications you can use the supplied RJ 45 to DB 9 crossover adapter with a standard RJ 45 cable to achieve the required null modem configuration By default this port is configured with these parameters 8N1 eight data bits no parity one stop bit 9600 baud Disable hardware flow control CTS RTS Disable software flow control XON XOFF Pin Signal Description Pin Signal Description 1 Clear to Send 5 G...

Page 67: ...onnection to the SP The service processor network management port uses an RJ 45 cable for a 10 100BASE T connection If your network does not use a DHCP server this port will not be available until you configure network settings through the SER MGT port This port does not support connections to Gigabit networks Pin Signal Description Pin Signal Description 1 Transmit Data 5 No Connect 2 Transmit Da...

Page 68: ...ach port described in this table Connection Type IEEE Terminology Transfer Rate Fast Ethernet 100BASE TX 100 Mbits sec Gigabit Ethernet 1000BASE T 1000 Mbits sec 10 Gigabit Ethernet 10GBASE T 10000 Mbits sec Note The Oracle ILOM sideband management feature enables you to access the SP using one of these Ethernet ports Refer to the Oracle ILOM Administor s Guide for Configuration and Maintenance Fo...

Page 69: ...n Available Connections on page 61 Rear Panel Components Installation on page 15 SER MGT Port on page 66 NET MGT Port on page 67 USB Ports on page 69 USB Ports You can access two USB ports from the front of the server and one USB port from the rear of the server The USB ports support hot plugging You can connect and disconnect USB cables and peripheral devices while the server is running without a...

Page 70: ...s 6 ft of cable is needed you must use an USB 3 0 Hub Note You can connect up to 126 devices to each of the three USB controllers two ports in front one port in rear Pin Signal Description Pin Signal Description 1 5V supply 3 Data 2 Data 4 Ground Related Information Available Connections on page 61 Rear Panel Components Installation on page 15 SER MGT Port on page 66 NET MGT Port on page 67 10 Gig...

Page 71: ...al server to the SER MGT Port Connect a Terminal or Emulator to the SER MGT Port on page 81 Oracle ILOM System Console on page 82 5 Power on the server and start the Oracle ILOM system console Power on the Server for the First Time on page 83 or Configure the Preinstalled OS on page 86 6 Configure the preinstalled OS or install a fresh OS Configure the Preinstalled OS on page 86 or Reach a State t...

Page 72: ... the power supply ground pins or with the chassis ground studs It is acceptable to have both grounds connected This procedure is optional for servers with AC input power however it is highly recommended For AC input power it is acceptable to ground the server through the supplies and chassis ground wire 1 Retrieve the grounding lug and two M5 nuts from the shipping kit 2 Insert the grounding wire ...

Page 73: ...tuds using the two M5 nuts 6 Secure the other end of the grounding wire to the earth ground in the building You can secure the grounding wire to a proper grounding point on the rack as long as the rack is properly grounded to the earth ground in the building 7 Consider your next step Connect the AC input power cord See Assemble the DC input power cord See Assemble the DC Input Power Cords on page ...

Page 74: ...le ILOM on the SP initializes as soon as a power cable connects a power supply to an external power source System messages might be lost after 60 seconds if a terminal or terminal emulator is not connected to the SER MGT port before power is applied Note Oracle ILOM signals a fault if both power supplies are not cabled at the same time since it will be a nonredundant condition Do not be concerned ...

Page 75: ... on page 15 Powering On the Server for the First Time on page 71 Assembling and Connecting DC Power Cords These topics describe how to assemble DC power cords and apply power Step Description Links 1 Build the DC power cords and connect them to the server Assemble the DC Input Power Cords on page 76 2 Connect the chassis ground wire Connect the Chassis Ground Wire on page 72 3 Connect the DC power...

Page 76: ...ifications See DC Power Source Power Connection and Grounding Requirements on page 21 c Obtain a crimping tool or a soldering gun and supplies d Obtain heat shrink tubing in colors matching the ground positive and negative cord designations 2 Ensure that no DC power is present on the cords being installed Caution Do not proceed with these instructions until you are sure that there is no voltage pr...

Page 77: ...ed with a minus symbol 5 Strip 1 2 in 13 mm of insulation from each of the wires Do not strip more than 1 2 in 13 mm from each wire Doing so leaves uninsulated wire exposed from the DC connector after the assembly is complete No Description 1 1 2 in 13 mm maximum 6 Using a Phillips screwdriver remove the terminal housing cover Powering On the Server for the First Time 77 ...

Page 78: ...es not damage the tubing 9 Insert the stripped end of a cord into the barrel of a ring terminal then either crimp the barrel or solder the wire to the inside of the barrel 10 Repeat the procedure for the other two wires 11 Lower the heat shrink tubing over each of the ring terminal barrels then shrink fit the tubing with a heat gun 12 Observing correct polarity designations for the attached cords ...

Page 79: ...ver 15 Insert the completed power supply unit into the server 16 Repeat this procedure to create as many DC power supply units as you need for your system 17 Connect the DC power source See Connect DC Power Source on page 80 Powering On the Server for the First Time 79 ...

Page 80: ...reakers at this time 3 Connect a device to the SER MGT port See Connect a Terminal or Emulator to the SER MGT Port on page 81 Note The server will enter Standby mode and the Oracle ILOM SP will initialize as soon as a power source is connected System messages might be lost after 60 seconds if a terminal or terminal emulator is not connected to the SER MGT port before power is applied Note Oracle I...

Page 81: ... Connected power cords See Connect AC Power Cords on page 74 or Assembling and Connecting DC Power Cords on page 75 2 Connect a terminal or a terminal emulator PC or workstation to the server SER MGT port 3 Configure the terminal or terminal emulator with these settings 9600 baud 8 bits No parity 1 Stop bit No handshake A null modem configuration is needed meaning the transmit and receive signals ...

Page 82: ...lizes the SP OK Fault LED remains lit the main power OK Fault LED slowly flashes and the SP login prompt displays on the terminal device However the host is not initialized or powered on yet 7 Continue with the installation by powering on the server for the first time See Powering On the Server for the First Time on page 71 Related Information Connect Other Data Cables on page 65 Configure the Pre...

Page 83: ...M CLI on page 87 Reach a State to Install a Fresh OS Oracle ILOM Web Interface on page 88 Assign a Static IP Address to the NET MGT Port on page 92 Power on the Server for the First Time 1 Connect a terminal device to the server s SER MGT port See Connect a Terminal or Emulator to the SER MGT Port on page 81 2 At the terminal device log in to the SP login root Password changeme After a brief delay...

Page 84: ...he initialization press the Hash Dot keys to return to the Oracle ILOM prompt Then type stop System 4 Optional Redirect the host output to display on the serial terminal device start HOST console Are you sure you want to start SP console y n y Serial console started 5 Optional Execute other Oracle ILOM commands while the server initializes a To display the Oracle ILOM prompt press the Hash Dot key...

Page 85: ... the server will not reduce speed when high temperatures are detected If you prefer full performance over NEBS disable this feature 1 To disable NEBS mode type cd HOST HOST ls HOST Targets Properties autorestart reset nebs_mode enabled set nebs_mode disabled 2 Continue with the installation by installing the OS See Installing the OS on page 86 Related Information Oracle ILOM System Console on page...

Page 86: ...cle ILOM Web Interface on page 88 2 When prompted follow the onscreen instructions for configuring the Oracle Solaris OS on your host You are prompted to confirm the configuration several times enabling confirmation and changes If you are not sure how to respond to a particular value you can accept the default and make future changes when the Oracle Solaris OS is running See Oracle Solaris OS Conf...

Page 87: ...stems comparing installation options at http www oracle com goto Solaris11 docs 2 From Oracle ILOM set the OpenBoot auto boot parameter to false set HOST bootmode script setenv auto boot false This setting prevents the server from booting from the preinstalled OS When you use bootmode the change applies only to a single boot and expires in 10 minutes if the power on the host is not reset 3 When yo...

Page 88: ...from disk with flags as dload filename addr debug load of file over network at address Examples 4000 dload export root foo test go if executable program execute it or if Forth program compile it 6 During the installation supply the configuration parameters as directed See Oracle Solaris OS Configuration Parameters on page 91 Related Information Configure the Preinstalled OS on page 86 Reach a Stat...

Page 89: ...Host Management Host Boot Mode The Host Boot Mode page is displayed 4 Apply these changes to the Host Boot Mode Settings a For State select Reset NVRAM This setting applies a one time NVRAM OpenBoot change based on the script setting then resets the NVRAM to default settings on the next host reset b For Script type setenv auto boot false This setting configures the host to stop at the ok prompt in...

Page 90: ... is to boot from DISK if present otherwise from NET boot net boot kernel from network boot cdrom boot kernel from CD ROM boot disk1 h boot from disk1 partition h boot tape boot default file from tape boot disk myunix as boot myunix from disk with flags as dload filename addr debug load of file over network at address Examples 4000 dload export root foo test go if executable program execute it or i...

Page 91: ...ent IPv6 Specify whether or not to use IPv6 If you are not sure select No to configure the Ethernet interface for IPv4 Security Policy Select either standard UNIX security No or Kerberos Security Yes If you are not sure select No Confirm Review the onscreen information and change it if needed Otherwise continue Name Service Select the name service according to your network environment If you selec...

Page 92: ...you are not already connected through the SER MGT port perform steps as needed in Connect a Terminal or Emulator to the SER MGT Port on page 81 2 Set the SP to accept a static IP address set SP network pendingipdiscovery static Set pendingipdiscovery to static 3 Set the IP address for the SP To change the default IPv4 DHCP property and set property values for a static IPv4 address type IPv4_addres...

Page 93: ...dress xxx xxx xxx xxx ipdiscovery dhcp ipgateway xxx xxx xxx xxx ipnetmask 255 255 255 0 macaddress xx xx xx xx xx xx managementport MGMT outofbandmacaddress xx xx xx xx xx xx pendingipaddress service processor IPaddr pendingipdiscovery static pendingipgateway gateway IPaddr pendingipnetmask 255 255 255 0 pendingmanagementport MGMT sidebandmacaddress xx xx xx xx xx xx state enabled 7 Set the chang...

Page 94: ... issue before you re even aware that a problem exists Oracle products with Oracle ASR securely transport electronic fault telemetry data to Oracle automatically to help expedite the diagnostic process The one way event notification requires no incoming Internet connections or remote access mechanism Only the information needed to solve a problem is communicated to Oracle Oracle ASR is a feature of...

Page 95: ...acle com cd E37710_01 index htm How to Approve Pending ASR Assets In My Oracle Support DOC ID 1329200 1 https support oracle com rs type doc id 1329200 1 Related Information Oracle Auto Service Request Documentation http docs oracle com cd E37710_01 index htm Powering On the Server for the First Time 95 ...

Page 96: ...96 Netra SPARC S7 2 Server Installation Guide January 2017 ...

Page 97: ...B baud rate for serial terminal 81 bits setting for serial terminal 81 boot process 82 branch circuit 21 C cables Category 6 64 connecting 61 connecting data and management 63 connecting other data 65 connecting SP 64 power cords 74 cablies connecting Ethernet ports 64 cabling Ethernet ports 64 power cords 74 SP 64 Category 6 cables 64 cautions DC power 21 rack 32 chassis ground posts 15 circuit o...

Page 98: ...2 equipment loading 32 error messages boot process 82 ESD mat 29 precautions 29 Ethernet ports 12 15 61 cabling 64 F fans 12 features server 12 frequency specifications 18 front panel components 14 G ground posts 15 21 72 ground wire connecting 72 grounding 32 requirements 21 strap 29 H handling precautions 28 handshaking for serial terminal 81 hardmount kit installing 33 height 17 humidity specif...

Page 99: ...le ILOM system console 82 Oracle Solaris configuration parameters 91 installing a fresh OS Oracle ILOM CLI 87 installing a fresh OS Oracle ILOM web interface 88 OS configuring preinstalled 86 OS installing 86 overcurrent protection requirements 20 overview installation tasks 11 server 12 P parity for serial terminal 81 PCIe slots 12 15 physical specifications 17 pinouts NET MGT port 67 NET ports 6...

Page 100: ... 80 confirming site and server specifications 17 depth 17 features 12 height 17 increase performance 85 installing 31 lifting cautions 28 models 14 overview 12 understanding 11 weight 17 width 17 service processor show command 92 Service Required LED 14 15 shipping kit inventory 27 show SP network command 92 show command 92 site specifications 17 sliding rail kit installing 40 SP 12 cabling 64 spe...

Page 101: ...K LED 14 15 T task overview installation 11 Telco alarm LEDs 14 temperature ambient 22 specifications 22 terminal device 29 tools installation 29 U U S NEC 20 understanding server 11 USB ports 12 14 15 69 User alarm LED 14 V voltage specifications 18 W Wago connector 21 weight 17 width 17 wrist strap 29 101 ...

Page 102: ...102 Netra SPARC S7 2 Server Installation Guide January 2017 ...

Reviews: