Index
A
agency compliance specifications, 18
C
cable management arm (CMA)
installing on storage server, 40
uninstalling, 55
cabling, required cable connections, 61
E
environmental specifications, 16
I
installing storage server
installing storage server into a rack, 25
installing storage server, tools required, 27
M
mounting brackets, installing, 30
N
network management (NET MGT) port, location
O
optional components, installing, 14
P
physical specifications, 15
R
rack installation, 25
rackmount
kit, 25
rail assembly, 25
stabilizing the rack, 29, 49, 53, 55
rail assembly, 25
S
serial management (SER MGT) port, 62
shipping cartons
checking for damage, 13
slide-rails
spares kit components, installing, 14
specifications
physical, 15
T
tool-less slide-rail assemblies, installing, 35
71
Summary of Contents for EXADATA X5-2
Page 2: ......
Page 8: ...8 Oracle Exadata Storage Server X5 2 Extreme Flash Installation Guide July 2018 ...
Page 24: ...24 Oracle Exadata Storage Server X5 2 Extreme Flash Installation Guide July 2018 ...
Page 60: ...60 Oracle Exadata Storage Server X5 2 Extreme Flash Installation Guide July 2018 ...
Page 66: ...66 Oracle Exadata Storage Server X5 2 Extreme Flash Installation Guide July 2018 ...
Page 70: ...70 Oracle Exadata Storage Server X5 2 Extreme Flash Installation Guide July 2018 ...