background image

Verify Installation Requirements

 

 

Packaged Base Rack
with Shipping Pallet

Fully Populated
Base Rack

Height

2159mm (85 in)

1998mm (78.66 in)

Width

1219mm (48 in)

600mm (23.62 in)

Depth

1575mm (62 in)

1200mm (47.24 in)

Weight

996kg (2197 lbs)

894kg (1972 lbs)

With Shipping Pallet

Without Shipping Pallet

Minimum door height

2184mm (86 in)

2040mm (80.32 in)

Minimum door width

1220mm (48 in)

600mm (23.62 in)

Minimum elevator depth

1575mm (62 in)

1200mm (47.24 in)

Maximum incline

6 degrees

6 degrees

Loading capacity (elevator,
pallet jack, floor)

1134kg (2500 lbs)

1134kg (2500 lbs)

 

Access Requirement

Rear maintenance

914mm (36 in)

Front Maintenance

914mm (36 in)

Top Maintenance

914mm (36 in)

Side panel removal

676mm (26.6 in)

 

Operating
Requirement

Non-operating
Requirement

Optimum

Temperature

5°C to 32°
(41°F to 89.6°F)

-40°C to 70°C
(-40°F to 158°F)

21°C to 23°C
(70°F to 74°F)

Relative
humidity

10-90 percent,

non-condensing

93 percent
maximum

45-50 percent, non-condensing

Altitude

3048m (10000ft)

maximum

12000m
(40000ft)

ambient temperature is reduced by 1°C per
300m above 900m altitude above sea level

  

Note:

 

Allow enough space to remove the shipping cartons. The minimum required depth 

for roll-off is 4.5m (15ft). Refer to the Sun Rack II Unpacking Guide (820-5210) included with 
the packaging for further details.

 A

  Receiving and unpacking:

  Access route to installation site:

  

Each rack has two preinstalled power distribution units (PDUs).  The PDUs accept different

    power sources. You must specify the type of PDU that is correct for your data center.

  Verify that the PDUs installed are correct for your data center power source: 22 or 24kVA for

    low or high voltage.

  PDU power cords are 4m (13.1ft) long, and up to 1.5m (4.9ft) is routed within the rack cabinet.

    AC power receptacles must be within 2m (6.6ft) of the rack.

  Use dedicated AC breaker panels for all power circuits that supply power to the PDU.

  Use dedicated AC breaker panels for all power circuits that supply power to the compute nodes.

    Compute nodes require electrical circuits to be grounded to the Earth.

  

Note:

 Circuit breakers are supplied by the customer. One circuit breaker is required for each power cord.

  In addition to circuit breakers, provide a stable power source, such as an uninterruptable power

    supply (UPS) to reduce the possibility of component failures.

F

   Racks are shipped with grounding-type power cords (three-wire). Always connect the cords to

    grounded power outlets. Verify the correct grounding method for your location.

  Maintenance clearance:

Appliance Components

 

 

A

   ZFS  Storage  Appliance

B

   Management Nodes (2)

C

   Compute Nodes (up to 25)

D

   F1-15 Fabric Interconnects (2)

E

   NM2-36P InfiniBand Switches (2)

F

   ES1-24 Ethernet Switch A|B

 A

  Oracle recommends using raised flooring, able to support the total weight

    of the system including power distribution units (PDUs): 1005kg (2215lbs).

 B

  Temperature, humidity and altitude:

  Provide adequate ventilation and cooling:

         •  

Make sure that the capacity of the air conditioning equipment is sufficient

             for the new system hardware.

        •  

Respect the maintenance clearance at the front and back of the system for

            optimum airflow. The air intake is at the front, and the air outlet is at the

            back.

        •  

Install perforated floor tiles (approximately 400 CFM/tile) in front of the

            rack for cold air intake. Use four tiles for a fully populated

            rack, three tiles for 8-16 compute nodes, or one

            tile for 8 or fewer compute nodes.

        •  

Cover empty rack units with filler

            panels to avoid adverse effects

            on airflow and cooling.

Data Center Configuration

Power Requirements

Network Requirements

Space Requirements

 A

  Four ports (2x2) on redundant next-layer switches in the data center 

must

 be reserved

    to connect the 10GbE public network ports of the Fabric Interconnects.

 B

  A terminal or workstation with a web browser 

must

 be connected to the management network.

 C

  Three IP addresses in the public network 

must

 be reserved for management node configuration.

 D

  The following network configuration details are required:

  

Note:

 All internal rack connections are pre-cabled, including non-populated rack units. Cabling should not be

 modified in any way.

 

Your Entry

Description

Domain Name

 

Data center network

Region and Time Zone

 

DNS IP address

 

IP address of one to three Domain Name Servers

NTP server IP address

 

IP address of your Network Time Protocol server

Default Gateway

 

IP address of the default gateway in your data center network

Management Node 1

 

IP address of the first management node in your
data center network

Management Node 2

 

IP address of the second management node in your
data center network

Management Virtual IP

 

IP address providing access to the master management node

Management VLAN

 

VLAN ID of the management network, if applicable

Location and time zone where the system is installed

C

D

F

E

D

C

B

A

Oracle Private Cloud Appliance Quick Start Guide 

(part 1)

1

Reviews: