Verify Installation Requirements
Packaged Base Rack
with Shipping Pallet
Fully Populated
Base Rack
Height
2159mm (85 in)
1998mm (78.66 in)
Width
1219mm (48 in)
600mm (23.62 in)
Depth
1575mm (62 in)
1200mm (47.24 in)
Weight
996kg (2197 lbs)
894kg (1972 lbs)
With Shipping Pallet
Without Shipping Pallet
Minimum door height
2184mm (86 in)
2040mm (80.32 in)
Minimum door width
1220mm (48 in)
600mm (23.62 in)
Minimum elevator depth
1575mm (62 in)
1200mm (47.24 in)
Maximum incline
6 degrees
6 degrees
Loading capacity (elevator,
pallet jack, floor)
1134kg (2500 lbs)
1134kg (2500 lbs)
Access Requirement
Rear maintenance
914mm (36 in)
Front Maintenance
914mm (36 in)
Top Maintenance
914mm (36 in)
Side panel removal
676mm (26.6 in)
Operating
Requirement
Non-operating
Requirement
Optimum
Temperature
5°C to 32°
(41°F to 89.6°F)
-40°C to 70°C
(-40°F to 158°F)
21°C to 23°C
(70°F to 74°F)
Relative
humidity
10-90 percent,
non-condensing
93 percent
maximum
45-50 percent, non-condensing
Altitude
3048m (10000ft)
maximum
12000m
(40000ft)
ambient temperature is reduced by 1°C per
300m above 900m altitude above sea level
Note:
Allow enough space to remove the shipping cartons. The minimum required depth
for roll-off is 4.5m (15ft). Refer to the Sun Rack II Unpacking Guide (820-5210) included with
the packaging for further details.
A
Receiving and unpacking:
C
Access route to installation site:
Each rack has two preinstalled power distribution units (PDUs). The PDUs accept different
power sources. You must specify the type of PDU that is correct for your data center.
A
Verify that the PDUs installed are correct for your data center power source: 22 or 24kVA for
low or high voltage.
B
PDU power cords are 4m (13.1ft) long, and up to 1.5m (4.9ft) is routed within the rack cabinet.
AC power receptacles must be within 2m (6.6ft) of the rack.
C
Use dedicated AC breaker panels for all power circuits that supply power to the PDU.
D
Use dedicated AC breaker panels for all power circuits that supply power to the compute nodes.
Compute nodes require electrical circuits to be grounded to the Earth.
Note:
Circuit breakers are supplied by the customer. One circuit breaker is required for each power cord.
E
In addition to circuit breakers, provide a stable power source, such as an uninterruptable power
supply (UPS) to reduce the possibility of component failures.
F
Racks are shipped with grounding-type power cords (three-wire). Always connect the cords to
grounded power outlets. Verify the correct grounding method for your location.
B
Maintenance clearance:
Appliance Components
A
ZFS Storage Appliance
B
Management Nodes (2)
C
Compute Nodes (up to 25)
D
F1-15 Fabric Interconnects (2)
E
NM2-36P InfiniBand Switches (2)
F
ES1-24 Ethernet Switch A|B
A
Oracle recommends using raised flooring, able to support the total weight
of the system including power distribution units (PDUs): 1005kg (2215lbs).
B
Temperature, humidity and altitude:
C
Provide adequate ventilation and cooling:
•
Make sure that the capacity of the air conditioning equipment is sufficient
for the new system hardware.
•
Respect the maintenance clearance at the front and back of the system for
optimum airflow. The air intake is at the front, and the air outlet is at the
back.
•
Install perforated floor tiles (approximately 400 CFM/tile) in front of the
rack for cold air intake. Use four tiles for a fully populated
rack, three tiles for 8-16 compute nodes, or one
tile for 8 or fewer compute nodes.
•
Cover empty rack units with filler
panels to avoid adverse effects
on airflow and cooling.
Data Center Configuration
Power Requirements
Network Requirements
Space Requirements
A
Four ports (2x2) on redundant next-layer switches in the data center
must
be reserved
to connect the 10GbE public network ports of the Fabric Interconnects.
B
A terminal or workstation with a web browser
must
be connected to the management network.
C
Three IP addresses in the public network
must
be reserved for management node configuration.
D
The following network configuration details are required:
Note:
All internal rack connections are pre-cabled, including non-populated rack units. Cabling should not be
modified in any way.
Your Entry
Description
Domain Name
Data center network
Region and Time Zone
DNS IP address
IP address of one to three Domain Name Servers
NTP server IP address
IP address of your Network Time Protocol server
Default Gateway
IP address of the default gateway in your data center network
Management Node 1
IP address of the first management node in your
data center network
Management Node 2
IP address of the second management node in your
data center network
Management Virtual IP
IP address providing access to the master management node
Management VLAN
VLAN ID of the management network, if applicable
Location and time zone where the system is installed
C
D
F
E
D
C
B
A
Oracle Private Cloud Appliance Quick Start Guide
(part 1)
1