52
Acme Packet 4500 Hardware Installation and Maintenance Guide
SYSTEM INSTALLATION
chassis rear panel and the kep nuts.
Figure 4 - 68. Ground Cables Secured to the Ground Posts
4.
Connect the other end of the grounding wire to a suitable grounding point at
your site.
Caution
Always make the ground connection first and disconnect it last
when installing or removing the system from an equipment
rack.
AC Power Cord
Installation
This section shows you how to install an AC power cord.
Caution
Use a 5 Amp fused circuit for each AC power supply.
Important:
This equipment is intended for installation in locations where National
Electrical Code (NEC) applies.
To install the AC power cords in the Acme Packet 4500:
1.
Locate the two AC power cords shipped with your Acme Packet 4500. Choose
one power supply to work on first.
2.
Connect one power cord to the power supply by inserting the 3-lead IEC-320
plug into the IEC connector located on the power supply.
Figure 4 - 69. Connecting the Power Cord to Power Supply B
Summary of Contents for Acme Packet 4500
Page 1: ...Acme Packet 4500 Hardware Installation and Maintenance Guide Formerly Net Net 4500 April 2015...
Page 6: ...vi Acme Packet 4500 Hardware Installation and Maintenance Guide...
Page 10: ...4 Acme Packet 4500 Hardware Installation and Maintenance Guide ABOUT THIS GUIDE...
Page 14: ...8 Acme Packet 4500 Hardware Installation and Maintenance Guide SAFETY...
Page 38: ...32 Acme Packet 4500 Hardware Installation and Maintenance Guide GRAPHIC DISPLAY...
Page 74: ...68 Acme Packet 4500 Hardware Installation and Maintenance Guide STARTUP...
Page 110: ...104 Acme Packet 4500 Hardware Installation and Maintenance Guide GLOSSARY...
Page 114: ...108 Acme Packet 4500 Hardware Installation and Maintenance Guide I INDEX...