background image

1. Remove the nuts from the studs on the back wall of the PV200 enclosure where the VIS Controller

Assembly is to be installed.

2. Attach the four (4) standoffs (50-0443) to the studs.

3. Hold the VIS Board Assembly (20-0415-XX) on the standoffs as shown above.

4. Put the four (4) screws through the holes in the VIS assembly and attach them to the standoffs.

5. Connect the 20-1732 AVI Petro-Net Cable to one of the three Molex connectors (J6/J7/J8) of the Petro-

Net Power Hub Board (20-0414).

6. Connect the Yellow, Violet, Black and Red terminal wires of the 20-1732 cable to the J1 Terminal Block

of the VIS Board Assembly as shown in the illustration above.

Install the Antenna

For information on the installation of the recommended antenna types (Body Mount or Panel style) refer to
M1040-ANT AVI Antenna Installation.

OPW Fuel Management Systems, 6900 Santa Fe Drive, Hodgkins, IL 60525 • 708-485-4200 • www.opwglobal.com/opw-fms

Doc. No.: M00-20-4465 Rev.: 1

Page 2 of 2

Reviews: