OP350 System Installation, Operation & Maintenance
8
push-to-connect fittings on the Processor and
Repressurization Assembly.
6. Route the cable coming from the tank switch
to the electrical box on the processor. Connect
the AMP connector to the TANK ELECTRICAL
CONNECTION located on the grey electrical box.
7. OPTIMIZED WATER TO EQUIPMENT: Connect
a piece of 1/2” ID gray hose to the OPTIMIZED
WATER OUTLET on the processor with a 1/2”
hose barb insert and clamp (supplied). At a later
time, the other end of this line will be connected
to the distribution line that will deliver Optimized
Water to the equipment, but
for now leave the line
loose and route the loose end of the gray hose into
a drain or bucket. (Make certain the hose length
will reach the storage tank; this will be required for
the Start-Up procedure.)
Prepare any necessary
plumbing to make the connection between the
1/2” hose and the distribution line, which will be
completed in “Connect to Equipment”.
NOTE: If additional Post Filtration is used, it will be
installed between the Optimized Water Outlet and the
designated equipment.
Install QT Cartridges
NOTE: Before installing the QT Cartridges make sure
to remove the plugs in the QT heads.
1. Insert the CTO-Q cartridges into QT heads 1 & 2
(starting from the left or inlet side of the processor)
and turn to align arrows.
2. Insert the AMS-QT membrane cartridge into the
QT head #3 and turn to align arrows.
3. Connect the Push-to-Connect elbow (remove plug
in elbow) on the end of the black Reject tubing to
the stem connector on the bottom of the AMS-QT
cartridge.
4. Insert the MA-Q15 cartridge into the QT head #4
and turn to align arrows.
Optional RP Assembly Location
The Repressurization Pump and Buffer Tank assembly
is on a stand that can be remote from the storage tank.
Simply remove the four bolts on the feet of the bracket
and lengthen the gray hose from the tank to the pump
and the red bypass tubing from the Tank Inlet Divert
Valve to the required length. Four rubber feet and
mounting screws are avallable to put on the bottom of
the Tank Stand. Use the following Kit Part number:
16Gal Tank - 164-89116
50Gal Tank - 164-89150
System Start-Up
Refer to illustrations “Typical Installation” (page 6) and
“Switch Testing” (page 18).
IMPORTANT:
Before proceeding, position the
Processor EMERGENCY BYPASS VALVE in the
“SERVICE” position, assure that the BUFFER TANK
VALVE is open, and position the TANK INLET DIVERT
VALVE in the down position (Blue Valve Handle
pointing sideways).
1. Slowly open the user-supplied WATER SUPPLY
VALVE. Plug the processor power cord into a
120VAC outlet. Allow the filter housings to fill, and
water will begin to flow from the end of the 1/4”
black tubing routed to the drain. After some time,
water will begin to flow into the tank. Allow several
minutes to flush the system until water flows
smoothly into the tank and also from the drain line.
Check all of the plumbing connections and correct
any leaks if necessary.
2. Test the float switch. With the tank lid removed and
the system running, raise and tilt the processor
control float (in the tank). As you raise the float
upward, the ball inside the float will roll from one
end of the float to the other, activating the switch.
• With the float in the upright position, the water
processor should shut off the water flow.
Repressur-
ization Assy
Outlet
Tank Inlet
Divert Valve-
Shown in the
normal positon
Optimized
Water Inlet
50 Gallon Storage Tank
Repressurization
Assy Outlet
Optimized
Water Inlet
Tank Inlet Divert
Valve- Shown in the
normal positon
16 Gallon Storage Tank