Delivery, interdepartmental transport, assembly and commissioning
Version 1.0.1 - 2020-10-14
10
Translation of original instruction
GBS75 | GBS150
EN
GBS
75_G
BS15
0_G
B.
fm
3.2
Unpacking and connecting
The belt grinder is mounted ready for operation. In order to obtain the correct direction of rota-
tion, the phase sequence must be changed if necessary. This is done at your three-phase con-
nection or - if equipped with it - at the three-phase connector by changing the phase sequence.
3.3
Scope of delivery
Check the belt grinder immediately after delivery for transport damage, missing parts and loose
locking bolts. Compare the scope of delivery with the delivery note. Sanding belts are available
in specialist shops or from our main catalogue.
3.4
Storage
ATTENTION!
Incorrect and improper storage might result in damage or destruction of electrical and
mechanical machine components.
Store packed and unpacked parts only under the intended environmental conditions.
Follow the instructions and information on the transport box.
Consult Optimum Maschinen Germany GmbH if the machine and accessories are stored for
more than three months or are stored under different environmental conditions than those spec-
ified here.
3.5
Set-up and assembly
3.5.1 Installation site requirements
Organise the working area around the grinding machine according to the local safety regula-
tions.
CAUTION!
The belt grinder must be firmly connected to the substructure. For this purpose there are
holes in the base to screw the belt grinder to your ground.
INFORMATION
In order to achieve high levels of functionality and machining accuracy, as well as a long ser-
vice life of the machine, the set-up location should meet certain criteria.