background image

(1) Prepare an appropriate Dual Gang Box.
(2) Using an Allen key, detach the SIP base from the SIP main unit.

(1) Plug the alarm 10-pin cable to 

PIE-1.

(2) Plug the power 2-pin cable to 

PIE-1. Use the 12VDC connector.

Note: When using an optional heating 

unit, use the 24VDC connector.

(3) Set the Selector switch of PIE-1 

to the left.

(4) Plug a CAT5 cable to the 

Ethernet connector for PoE.

(5) Place the PIE-1 into the Dual 

Gang Box.

(1) Take off a rectangular gasket 

and two round gasket from the 

gasket sheet.

(2) Apply the rectangular gasket on 

the SIP mounting plate.

(3) Apply the two round gaskets in 

layers around the round hole of 

the SIP mounting plate. 

(1) Pass the alarm 10-pin 

cable and the power 

2-pin cable through 

the hole.

(2) Using four screws, 

mount the SIP 

mounting plate to the 

Gang Box.

(3) Pass the cables 

through the hole on 

the back of the SIP 

base.

(4) Using two screws, 

mount the SIP base to 

the SIP mounting plate 

on the Gang Box.

Step 1

Step 3

Step 2

Step 4

Step 6

Step 5

Step 7

Mount the SIP 

main unit onto 

the SIP base.

(1) Connect the power and alarm 

cables.

(2) If cables are too long, put the 

extra portions into the Gang Box.

When the PIE-1 unit is accommodated not in Gang box, mount it in weather proof box or cabinet to avoid moisture.

Plug the alarm 6-pin cable, the 

alarm 4-pin cable and the power 

2-pin cable to terminals on the SIP 

base.

      

CONNECT PIE-1 TO THE SIP MAIN UNIT

2

Warning

Note: Refer to the 

Connection 

Table.

Step 3

Step 4

Step 5

Step 6

Step 2

(1) (2)

(3)

(4)

Do not use

Reviews: