(1) Prepare an appropriate Dual Gang Box.
(2) Using an Allen key, detach the SIP base from the SIP main unit.
(1) Plug the alarm 10-pin cable to
PIE-1.
(2) Plug the power 2-pin cable to
PIE-1. Use the 12VDC connector.
Note: When using an optional heating
unit, use the 24VDC connector.
(3) Set the Selector switch of PIE-1
to the left.
(4) Plug a CAT5 cable to the
Ethernet connector for PoE.
(5) Place the PIE-1 into the Dual
Gang Box.
(1) Take off a rectangular gasket
and two round gasket from the
gasket sheet.
(2) Apply the rectangular gasket on
the SIP mounting plate.
(3) Apply the two round gaskets in
layers around the round hole of
the SIP mounting plate.
(1) Pass the alarm 10-pin
cable and the power
2-pin cable through
the hole.
(2) Using four screws,
mount the SIP
mounting plate to the
Gang Box.
(3) Pass the cables
through the hole on
the back of the SIP
base.
(4) Using two screws,
mount the SIP base to
the SIP mounting plate
on the Gang Box.
Step 1
Step 3
Step 2
Step 4
Step 6
Step 5
Step 7
Mount the SIP
main unit onto
the SIP base.
(1) Connect the power and alarm
cables.
(2) If cables are too long, put the
extra portions into the Gang Box.
When the PIE-1 unit is accommodated not in Gang box, mount it in weather proof box or cabinet to avoid moisture.
Plug the alarm 6-pin cable, the
alarm 4-pin cable and the power
2-pin cable to terminals on the SIP
base.
CONNECT PIE-1 TO THE SIP MAIN UNIT
2
Warning
Note: Refer to the
Connection
Table.
Step 3
Step 4
Step 5
Step 6
Step 2
(1) (2)
(3)
(4)
Do not use