
Transport, unpacking, setting up
If the device is brought from a cold environment into the operating room, condensati-
on may occur. Please wait until the device has reached the correct temperature and is
absolutely dry before putting it into operation. The acclimatization time depends on
the temperature difference and the device as well as its construction. However, it
should be at least 12 hours.
Please wear protective gloves during installation to avoid the risk of injury. Before
mounting the hood, prepare the necessary tools.
For the installation of the hood, the customer must provide the prerequisites for a
smooth installation of the hood and cover kitchen appliances.
Prepare a suitable exhaust air duct, if necessary open false ceiling, partition walls,
kitchen block, create openings etc...
14
EN
6. ASSEMBLY PREPARATION
Summary of Contents for FONDA PRO
Page 1: ...FONDA PRO Installation manual EN NL Installation manual Montagehandleiding...
Page 2: ......
Page 13: ...11 EN 580 830 R 3 5...
Page 15: ...Duct terminal changeable 13 EN...
Page 25: ...n o FRONT BACK EN 23...
Page 26: ...7 Insert FONDA align create silicone joint EN 24...
Page 29: ...10 Install silencers EN 27 1 2 3 1 2 3...
Page 36: ......
Page 47: ...45...
Page 49: ...NL Kanaalterminal verwisselbaar 13 47...
Page 59: ...NL VOORKANT RUG O n 23 57...
Page 60: ...NL 7 FONDA plaatsen uitlijnen siliconenverbinding maken 24 58...
Page 63: ...NL 10 Installeer geluiddempers 3 2 1 1 2 3 27 61...
Page 70: ...35...