7
Option 2
Relocating the ONT and BBU
Some developers want to position the v and Battery Backup Unit (BBU) further
inside the property. This will require a longer connectorised internal fibre
cable which is recommended to be installed in a protective conduit to the
external Customer Splice Point (CSP) plus the provision of a power socket for
the equipment. Additional Cat6* cabling is required for this option from the
ONT & BBU to connections in the study and living room. These connections
should terminate in an RJ45 socket. A power socket should be provided for the
communications provider’s router, if the router is placed near the RJ45 socket
or a double socket if it is placed by the ONT and BBU.
*Cat6 is the preferred option to ‘future proof’ for modern devices
CSP: Customer Splice Point
ONT: Optical Network Termination
BBU: Battery Backup Unit
Connectorised fibre cable
Voice cable
Ethernet cable
Home wiring
How to build a fibre network - version 7.1
Summary of Contents for ONT
Page 1: ...fibre network Developer Guide Version 7 1 August 2018 How to build a ...
Page 21: ...21 Multi Dwelling Units MDUs Maisonettes How to build a fibre network version 7 1 ...
Page 22: ...22 Openreach Developer Guide Multi Dwelling Units MDUs Flat over garage ...
Page 23: ...23 Multi Dwelling Units MDUs Chalets How to build a fibre network version 7 1 ...
Page 24: ...24 Openreach Developer Guide Multi Dwelling Units MDUs Modular Passive homes ...
Page 27: ...27 Commercial units SME within an MDU How to build a fibre network version 7 1 ...
Page 28: ...28 Openreach Developer Guide Commercial units Commercial unit within a commercial only site ...
Page 50: ...50 Openreach Developer Guide Notes ...
Page 51: ...fibre network How to build a ...