Fibre cable and draw rope provided
in sound condition and correctly
jointed where applicable.
Duct
Duct
Cable/BFT left in planned location.
Correct rope/cables/tubing installed
as per Developer ‘How to’ guide.
Correct type of duct provided
and used.
Duct laid in required position, at
correct depth and installed in the
correct position in the Joint Box.
Duct properly trimmed and keyed
when set in walls.
Duct separation distance
maintained, or exception agreement
obtained and documented.
Ducts laid at minimum depth
(350mm), or exceptions agreed
and documented. (To be viewed in
footway where possible, if not check
via Joint Box).
Joint Box constructed as planned,
positioned correctly and conforms to
drawings. Alternatives agreed and
documented.
Temporary duct seals fitted to
agreed standard.
Ducts positioned correctly on
external walls and in line with the
cable entry point.
Item being audited
Category
Yes
No
N/A
Checked and
Acceptable
Standard?
Comments
Duct
Duct
Duct
Duct
Duct
Duct
Duct
Duct
Duct
Quality control checklist
How to build a fibre network - version 7.1
Summary of Contents for ONT
Page 1: ...fibre network Developer Guide Version 7 1 August 2018 How to build a ...
Page 21: ...21 Multi Dwelling Units MDUs Maisonettes How to build a fibre network version 7 1 ...
Page 22: ...22 Openreach Developer Guide Multi Dwelling Units MDUs Flat over garage ...
Page 23: ...23 Multi Dwelling Units MDUs Chalets How to build a fibre network version 7 1 ...
Page 24: ...24 Openreach Developer Guide Multi Dwelling Units MDUs Modular Passive homes ...
Page 27: ...27 Commercial units SME within an MDU How to build a fibre network version 7 1 ...
Page 28: ...28 Openreach Developer Guide Commercial units Commercial unit within a commercial only site ...
Page 50: ...50 Openreach Developer Guide Notes ...
Page 51: ...fibre network How to build a ...