CARBURETOR AND THROTTLE LINKAGE
55
float chamber. Clean all parts and blow out with
compressed air. Replace gaskets and seal rings.
14. Check actuating parts in automatic choke body,
including diaphragm, for wear. Check pull rod for
free operation. See Figure
15. Remove choke assembly by removing choke
valve and 2 choke housing to carburetor screws.
Figure
Checking Automatic Choke Parts
16. Check vacuum case assembly. If bushing is worn,
replace vacuum case assembly. See Figure
Figure
Checking Vacuum Case Brass Bushings
17. Install secondary vacuum diaphragm case assem-
bly. See Figure
18. Install gasket and shield between automatic
choke cover and automatic choke body.
Figure
Installing Vacuum Case Assembly
19. Install automatic choke cover so that the catch
of the
spring is positioned onto bent end of
the intermediate lever. See Figure
Figure
Installing Automatic Choke Cover
20. Align and tighten automatic choke cover. Choke
valve should be nearly closed at room temperature.
21. Check vent valve for free operation. Valve rod
must not be bent.
22. Screw in jets according to calibration table.
Never interchange parts of the primary and
barrel. See Figure
23. Install the throttle body to the bowl, using new
throttle body gasket. Adjust secondary throttle valve
gap by loosening lock nut on the secondary throttle
cardiagn.com