SAFETECH ST60-
X
SAFETECH ST60-
X
O p a l e - P a r a c h u t e s . c o m
Opale Aero System SARL - 23 rue de la Motte
62250 MARQUISE - France
[email protected] +33(0)981 144 387
© Copyright 2016 - Opale Aerosystem SARL - Tous droits réservés
O p a l e - P a r a c h u t e s . c o m
Opale Aero System SARL - 23 rue de la Motte
62250 MARQUISE - France
[email protected] +33(0)981 144 387
© Copyright 2016 - Opale Aerosystem SARL - Tous droits réservés
Initiating and standby procedures
Initiating procedure
Standby procedure
Switch on your transmitter and make sure that the
trigger button is on the locking position.
Place the “Remove Befor Flight“ in the arming rod
hole.
Power up the receiver or the stand-alone trigger
module. Check the binding / radio pairing.
Disconnect the receiver from the battery or from the
stand-alone trigger module.
Remove the “Remove Before Flight” pin.
Switch off the transmitter.
In order to guarantee the kit is efficiently operating and for an optimal lifespan, we recommend you to make
the following safety inspections and the following maintenance operations:
Parts
Inspections periodicity
Actions
- Servomotor
20 deployments
Check the good working without
the pin. No sprocket is dammaged.
Replace if necessary.
- Piston line
10 deployments
Preventive replacement.
- Piston line
1 deployments
Visual verificiation of non rupture.
- Parachute
1 deployments
Make a folding.
- Parachute
50 deployments
Check the good condition of the lines
and fabrics.
- Parachute
100 deployments
Send it to our workshop for a com-
plete inspection.
- Parachute
200 deployments
Preventive replacement.
- Parachute
2 months
If the parachute is not used for a 2
months period, make an unfolding
and a complete folding.
- Spring
50 deployments or 1 year
Preventive replacement.
- Tube
1 deployments
Check the tube, the base must not be
detach from the tube.
These operations can be done at our workshop.
Please contact your Opale Parachutes team.
Maintenance
Flat view
16
17