
F-2200 Series Vortex Flow Meter Installation and Operation Guide • Revised 12/08
11
SECTION 3.0: INSTALLATION INFORMATION
The F-2000 series vortex fl ow meter must be installed by a technician qualifi ed to work with pressurized
liquid, steam and/or gas fl ow and must conform to all federal, state and local building codes. ONICON will
be happy to assist with technical recommendations and to provide guidance via telephone or mail. On-site
engineering, installation and service are also available, at additional cost.
3.1 SITE
SELECTION
Careful attention in locating the point in the piping system where the fl ow meter will be installed
will ensure accurate and reliable operation. When selecting an installation site, consider the criteria
contained in Section 1.5 WORKING ENVIRONMENT, as well as the following:
!
3.1.1 Flow Direction And Meter Position
The
fl ow must always be in the direction of the arrow located on the meter body.
This will orient the bluff side of the vortex shedder bar so that it faces the incoming
fl ow (i.e. the upstream side).
For vertical pipe runs, fl ow must always be in the upward direction. Consult the
factory in the event that a downward fl owing pipe is the only available location.
CAUTION
The installation guidelines presented below are minimum requirements for the proper operation of
this fl ow meter.