6
CAUTION
Per EN 250, S.C.U.B.A. shall be equipped with at least thefollowing sub-assemblies:
1. Air Cylinder(s) with cylinder valve(s) and carrying frame.
2. Demand Regulator (first and second stage).
3. Safety Device / pressure gauge.
4. Carrying Systems / body harness
5. Face piece: Mouthpiece assembly or full face mask or diving helmet.
REGULATOR FIRST STAGE
Congratulations – and thank you – for choosing the OMS Airstream Evoque Regulator. Your
new regulator has been designed and manufactured with pride, per the most exacting
standards for quality and performance.
WARNING:
Use a clean working place to prepare your first stage properly.
The first stage converts the tank’s high pressure breathing air to an intermediate pressure
of 135~145 psi that can be handled by the second stage regulator to deliver a smooth flow
of breathing air when you inhale. The intermediate pressure air also can be used for
inflation of a BC or dry suit.
Summary of Contents for Airstream Evoque Regulator
Page 17: ...17 MARKING EVS EN 250A 2014 Airstream Airstream for DIN...
Page 18: ...18 Airstream for YOKE Evoque Evoque...
Page 29: ...29...
Page 30: ...30 Notes...
Page 31: ...31 Notes...
Page 32: ...32 Notes...
Page 33: ...33 S E R I A L N O...