
TM Conveyor Tracking
Software version: TMflow 1.76
36
12
Save Vision Job
•
Click to save visual task, and
input a name for the visual task.
Figure 44 Save visual task
13
Check if Vision Job is successfully
created
•
Upon returning to TMflow, make
sure the vision task you just
edited appears on Vision Job.
Then click “OK” to complete the
setting.
Figure 45 Check visual task on list
14
Select Tool
•
Switch to the main thread and
select the tool for your application
Figure 46 Switch tool
15
Drag Point Node
•
Set as the robot’s initial work
point. (T5 is the selected tool)
Figure 47 Point Node