![Omron SYSMAC CX-Programmer 9 Operation Manual Download Page 197](http://html1.mh-extra.com/html/omron/sysmac-cx-programmer-9/sysmac-cx-programmer-9_operation-manual_744241197.webp)
171
Procedures
Section 6-1
(2) When a new project has been created, ST programs can be set as the
PLC’s initial program type. Select
Tools - Options
and click the
PLCs
Tab to set this option.
6-1-3
Allocating the ST Program to a Task
The ST program that was inserted in the project must be allocated to a task as
an execution unit. If a program has not been allocated to a task, there will be a
check mark over that program’s icon in the project workspace.
Note
The following procedure, which allocates a program to a task, can be per-
formed after the program has been created, but always allocate the programs
before transferring the user program to the PLC.
Use the following procedure to allocate a program to a task.
1,2,3...
1.
Right-click the inserted ST program item in the project workspace, and se-
lect
Properties
from the pop-up menu.
Select the
ST
Option.
Summary of Contents for SYSMAC CX-Programmer 9
Page 2: ......
Page 4: ...iv ...
Page 6: ...vi ...
Page 8: ......
Page 16: ...xvi ...
Page 20: ...xx ...
Page 26: ...xxvi Application Precautions 4 ...
Page 27: ...Part 1 Function Blocks ...
Page 28: ......
Page 154: ...128 Procedures Section 3 2 ...
Page 155: ...Part 2 Structured Text ST ...
Page 156: ......
Page 160: ...134 CX Programmer Specifications Section 4 2 ...
Page 206: ...180 Procedures Section 6 1 ...
Page 208: ...182 System defined external variables supported in function blocks Appendix A ...
Page 230: ...204 Revision History ...
Page 231: ......