2.5 Wiring
2-3
Preparation
■
Setting
example
System Configuration
:
Master --- PMU2A (power two-system)
Slave --- EMU8A (pulse/temperature)
CTD8E (CT expansion)
Purpose
:
Classification of operating signals (condition) for the facilities
of 3-phase 3-wire line.
Extraction of waste in the electric power of single-phase
2-wire
Measurement of electric power in facilities of each line.
Setting switch
:
Set the Pin no. 2 of DIP switch to OFF (CompoWay/F) across
the entire system.
Using the rotary switch, set the slave ID.
EMU8A (pulse/temperature) --- 5 (to use event input for
3-STATE)
CTD8E (CT expansion)
--- 1 (Because the setting range
of slave ID is from 1 to 4)
Unit no.
:
PMU2A
--- 01 (Because the setting range of unit no. is from
00 to 99.)
EMU8A
--- 02 (Because the setting range of unit no. is from
00 to 99)
CTD8E
--- 03 (Because the setting range of unit no. is from
00 to 99.)
* A unit no. is assigned by higher equipment (example: PC) to identify units from each other.
Connection configuration
:
H’11
0 0 0 1 0 0 0 1
- -
With/without
slave ID 6
With/without
slave ID 5
With/without
slave ID 4
With/without
slave ID 3
With/without
slave ID 2
With/without
slave ID 1
1 1
PMU2A
( 電力
2
系統 )
EMU8A
( パ
)
ユニ
ユ
ユニ
スレ
ス
CTD8E
ルス / 温度
ット
No.02
ID 5
ニット
No.01
ット
No.03
ID 1
ーブ
:
レーブ
:
(
CT
増設 )
負荷
負荷
負荷
負荷
負荷
負荷
負荷
負荷
負荷
R
S
T
L
N
(
K
)
電
源
側
(
L
)
(
K
)
(
負
荷
側
電
源
側
L
)
負
荷
側
CT
:
Power
supply
side (K)
Load
side (L)
Load
Load
Load
(Power
two-system)
(Pulse/
temperature)
(CT expansion)
Unit no. 01
Slave ID: 5
Unit no. 02
Slave ID: 5
Unit no. 03
Load
Load
Load
Load
Load
Load
Power
supply
side (K)
Load
side
(L)