![background image](http://html1.mh-extra.com/html/omron/cj2-cpu-series/cj2-cpu-series_connection-manual_740797029.webp)
7
.
Serial Communications Connection Procedure
24
3
Select
Create
from the Options
Menu in the PLC IO Table
Window.
A confirmation dialog box on the
right is displayed. Check that
there is no problem and click
Yes
.
A confirmation dialog box on the
right is displayed. Check that
there is no problem and click
Yes
.
4
The Transfer from PLC Dialog
Box is displayed.
Select
IO Table
and
SIO Unit
Parameters
and click
Transfer
.
When the transfer is completed,
the Transfer Results Dialog Box
is displayed.
Check that the transfer was
normally executed by referring
to the message in the dialog
box.
When the I/O table is created
normally, the dialog box displays
as follows:
Transfer Success: 1 Unit
Transfer Unsuccessful: 0 Unit
Click
OK
.
Summary of Contents for CJ2*-CPU Series
Page 63: ...58...