BU
1002
SWG / BU
3002
SWG
i
Procedure from installation to operation
Start
Installation/connection
Preparation for operation
Maintenance/
inspection
Yes
No
No
Yes
Read “Safety precautions”
Page iii
Remove the product from the
package and check the contents
Page 1
Perform installation and
connection Page 6
Check the operation and
displays Page 22
Charge the battery
Page 24
Measure the backup time
Page 24
Read “Using the UPS
monitoring software and
contact signal” Page 55
Operate Page 25
Deteriorated
battery?
Perform maintenance
and inspection Page 44
Replace the battery
Page 46
Are you
using UPS monitoring
software or contact
signal?
Charge the battery again
Page 24
* Preparation for operation is
complete.