iii
Procedure from installation to operation
Start
Installation/connection
Preparation for operation
Maintenance/
inspection
Yes
No
No
Yes
Read “Safety precautions”
Page v
Remove the product from the
package and check the contents
Page 1
Perform installation and
connection Page 5
Check the operation and
displays Pages 15
Charge the battery
Page 25
Measure the backup time
Page 34
Read “Using the UPS
monitoring software and
contact signal” Page 43
Operate Page 24
Deteriorated
battery?
Perform maintenance
and inspection Page 36
Replace the battery
Page 37
Are you
using UPS monitoring
software or contact
signal?
Charge the battery again
Page 25
* Preparation for operation is
complete.
Summary of Contents for BN150R
Page 69: ...57 Notes of Chinese 10 UPS UPS 1 FA OA Windows UPS...
Page 70: ...BN75R BN150R BN300R 10 58 2 FA OA 2...
Page 71: ...10 Troubleshooting 59 AC 50 60Hz AC AC AC AC 3P 2P AC AC...
Page 72: ...BN75R BN150R BN300R 10 60 5cm UPS UPS AC AC AC200V 240V AC200 240V...
Page 73: ...10 Troubleshooting 61 AC AC AC AC AC ON OFF AC INPUT PROTECTION 25 4 5 30 1mA...
Page 74: ...BN75R BN150R BN300R 10 62 AC UPS AC UPS...
Page 75: ...10 Troubleshooting 63 AC AC 50 60Hz 25 25 6 40 2 AC AC...
Page 76: ...BN75R BN150R BN300R 10 64 DC250V UPS 200V http www fa omron com cn Pb AC AC 50 60Hz...
Page 80: ...BN75R BN150R BN300R 68 BN300R 438 87 OMRON BN300R ESC 650...