
of handling 25.0 kV without causing X-Radiation.
NOTE :
It is important to use an accurate periodically calibrated high voltage meter.
1. Reduce the brightness to minimum.
2. Set the SERVICE switch to SERVICE .
3. Measure the High Voltage. The meter reading should indicate 23.5 kV±1.5 kV.
If the meter indication is out of tolerance, immediate service and correction is
required to prevent the possibility of premature component failure.
4. To prevent an X-Radiation possibly, it is essential to use the specified picture tube.
HORIZONTAL OSCILLATOR DISABLE CIRCUIT TEST SERVICE WARNING :
The test must be made as a final check before set is returned to the customer.
CONFIRMATION OF X-RAY MOVEMENT
1. Turn off TV set.
2. Connect the circuit below between TP1209 and TP1208.
Figure 2
3. Turn on DC Power, and then turn on the set. Confirm that the picture is on the
screen properly.
4. Confirm that the picture goes out of horizontal sync while getting down the voltage
to DC Power.
5. If this does not occur even when getting down the voltage of DC Power to 0 V, it
means that X-ray protect circuit is not operating.
Further confirmation and repair is required.
REPAIR PROCEDURES OF HORIZONTAL OSCILLATOR DISABLE CIRCUIT
1. Connect a DC voltmeter between capacitor C513 (+) on the Main circuit board and
chassis ground.
2. If approxi21.9 V is not present at that point when 120 V AC is applied, find
the cause. Check R503, R5505, C5507, C513 and D503.
3. Carefully check above specified parts and related circuits and parts. When the
circuit is repaired, try the horizontal oscillator disable circuit test again.
CIRCUIT EXPLANATION
5
Summary of Contents for PVQ-1300W
Page 9: ...Fig 1 3 Fig 1 4 9...
Page 10: ...10...
Page 13: ...5 1 2 1 2 Service Position 2 Fig 2 2 13...
Page 18: ...18...
Page 31: ...5 2 1 HOW TO READ THE IDENTIFICATION MARK OF CHIP COMPONENTS 31...
Page 34: ...6 1 2 Disassembly Method 34...
Page 35: ...35...
Page 37: ...Fig D4 37...
Page 38: ...Fig D5 38...
Page 43: ...6 2 2 Inner Parts Location Fig J1 1 43...
Page 44: ...6 2 3 EJECT Position Confirmation Fig J1 2 44...
Page 45: ...6 2 4 Grounding Plate Unit Full Erase Head and Cylinder Unit Fig J2 1 45...
Page 46: ...46...
Page 48: ...6 2 5 Capstan Belt Support Angle Intermediate Gear B and Main Cam Gear Fig J3 1 48...
Page 49: ...49...
Page 56: ...6 2 7 Reel Gear and Main Rod Fig J5 1 56...
Page 58: ...6 2 8 Stopper Angle Capstan Rotor Unit Oil Seal Capstan Stator C B A and MR Head Fig J6 1 58...
Page 59: ...59...
Page 61: ...61...
Page 65: ...6 2 10 1 Reassembly Notes 65...
Page 71: ...6 3 CASSETTE UP ASS Y SECTION 71...
Page 72: ...6 3 1 Top Plate Wiper Arm Unit and Holder Unit Fig K1 1 72...
Page 73: ...73...
Page 75: ...75...
Page 77: ...7 ADJUSTMENT PROCEDURES 7 1 SERVICE FIXTURES AND TOOLS 77...
Page 94: ...94...
Page 117: ...8 SCHEMATIC DIAGRAMS 8 1 SCHEMATIC DIAGRAM AND CIRCUIT BOARD LAYOUT 117...
Page 132: ...DIODES 132...
Page 139: ...CAPACITORS 139...