30
Check dimension b according to the following
table:
(ill.10) Strip cable insulation. L = 6-7, 5 mm. Take
care not to cut individual strands.
Recommended tool:
Stripping pliers PV-AZM,Order No.32.6027
Crimping
(ill.11) Notes to the operation ofthe crimping
pliers, see¬MA251-def (www.multicontact.com)
(ill.12) Push the crimped contact into the socket
resp. plug insulator until it engages. Pull lightly on
the lead to check that the metal part has
engaged.
Assembly control
(ill.13) Insert the test pin with the corresponding
side into the socket or plug to the end position. If
the contact is correctly assembled, the white
marking on the test pin
must be still visible.
(ill.14) Screw on the cable gland, hand-tight, with
the tools PV-MS. Or
Screw on the cable gland, with the tools PV-WZ-
AD/GWD and PV-SSE-AD4
In any case:
The tightening torque must be adapted to the
solar cables used in each specific case. Typical
values lie in a range between 2,5 Nm to 3 Nm.