SECTION 3. GENERATOR PROBE & ACCESSORY MAINTENANCE
3.4 BEARING RUN-IN
If the BEARING was replaced, it must be run-in before use.
1. Immerse 1/3 of the GENERATOR in water and run the MOTOR at a
low speed for one minute.
2. Increase speed at one minute intervals for three minutes
3. Run at full speed for one minute.
4. Disconnect the unit from the power source
NOTE:
If the probe is excessively noisy, turn the motor off and return to
step 1.
5. Remove the GENERATOR TUBE and clean the BEARING with the
brush. (DO NOT remove the bearing or collet nut)
6. Re-install the GENERATOR TUBE. The Tissue Master is now ready for
use.
9
Summary of Contents for TISSUE MASTER 125
Page 1: ...OMNI TISSUE MASTER USER MANUAL REV B ...
Page 14: ...NOTES 14 ...
Page 15: ...NOTES 15 ...