Four-way Cassette:
IECS018(24)J3A-DWG053(71)
IECS031(36,42,48)J3A-DWG090(105,120,140)
Note: The communication wire should be 3-core shielding wire, and the sheilding wire layer must be connected the
earth of sheet metal.
10. Trial Run
1. Conduct the test run only after all installation tasks have been completed.
2.
◼
◼
◼
◼
◼
◼
Check the following items during the test run.
Indoor and outdoor units are properly installed.
Piping length, and the amount of refrigerant charged have been recorded.
Piping and wiring are correct.
The voltage of the power supply is the same as the rated voltage of the air conditioner.
No leakage from the refrigerant piping system.
There is no obstacle at the air inlet and outlet of the IDUs and ODU.
Summary of Contents for OTEC ICHD009J0A-DMG026
Page 1: ...IECS D Series Round Flow Ceiling Cassette Technical Manual ...
Page 4: ...2 Part 1 General information 1 Model Names of Indoor Outdoor Units 3 2 External Appearance 4 ...
Page 33: ...109 2 Installation of Four way Cassette 2 1 Installating space ...
Page 61: ...17 ICHD031J0A DMG090 ...
Page 62: ...18 ICHD036J0A DMG105 ICHD042J0A DMG120 ICHD048J0A DMG140 ...
Page 63: ...19 ICHD060J0A DMG160 ...