background image

Page 4

                         PARTS LIST

1

2

3

4

5

6

7

8

Key Part Number Description

1.

F-452004N

Lock Nuts

2.

F-452330N

Adaptor

3.

F-452002

Wireholder

4.

F-452043N

O-ring

5.

 

6.

7.

8.

F-452287N

Guide Wire

F-452332N

Float Stop

*Float

*Meterbody

*Float & Meterbody must be ordered 
as a kit.

Page 3

             INSTALLATION INSTRUCTIONS

 
Remember that you are installing an instrument.  Adapters and fittings 
should be tightened only enough to prevent leaking.  Over tightening 
may damage the o-ring seals and threaded fittings.

Never hold the meterbody with pliers or similar tools that may scratch.

Never allow the flowmeter to support the weight of related pipe or 
tubing.

Be certain the meterbody is properly aligned with existing plumbing.
 
Misalignment will put excessive stress on the meterbody and may 
result in damage and a decrease in the maximum pressure.  If in doubt 
regarding proper plumbing procedures, consult a licensed plumber.

The flowmeter must be installed in an exact vertical plane to ensure 
accuracy. 

Polysulfone is adversely affected by ultraviolet light.  Protect the 
flowmeter from direct sunlight.

Always use teflon® tape thread sealant.  DO NOT use pipe dope 
compounds as these products may cause crazing and cracking on the 
meterbody.
 
Do not use solvent based glued (such as PVC cement) while the 
flowmeter is fully installed.  When using these glues, remove the 
meterbody until the glue has cured.  Then purge the system before 
installing the unit.

Never attempt to solder brass fittings while the flowmeter is fully 
installed.  The heat required for soldering can damage the flowmeter.

Caution should be exercised when using ball type valves.  In some 
cases when the valve is opened the float can slam to the top of the 
meter causing damage.  This “Water Cannon” effect is actually 
exceeding the maximum pressure and is not covered under warranty.

Your flowmeter had been designed to be virtually maintenance free.  
Should your unit need occasional cleaning, use a mild soap and soft 
bottle brush.

Be sure to note the floats “UP” position before disassembling the meter.

Your OMEGA FL45200A Series

!

Your OMEGA flowmeter was designed to be easy to install.

!

Please read the Instruction Guideline on the next page 
before installing your flowmeter.

!

This flowmeter is an instrument, special care should be taken 
when handling and installing.

Materials of Construction

Meter Body:          

Polysulfone

Float:

                     #316 Stainless Steel or Teflon or

                               Hastelloy C-276   (Based on model)

Guide rod:            

 # 316 Stainless (opt. Hastelloy C-276)

Adapters:

              Polysulfone  

Wireholder

Union Nuts:          

Nylon

O-Rings:

               Viton

Scale:

                    Permanent, dual scale silkscreen (black ink)

Accuracy:

             ± 2% of full scale reading

:           

Polysulfone

Float Stop:            

Polyethylene

18-7/8 in.
(479.4 mm)

4-5/8 in.
(117.5 mm)

Summary of Contents for FLOWMETER FL45200A

Page 1: ...R An Technologies Company OMEGA R R FL45200A Series In Line Flowmeters with Half Union Adapters Operator s Manual Omega com www...

Page 2: ...TELEX 996404 EASYLINK 62968934 CABLE OMEGA Servicing Europe United Kingdom Sales and Distribution Center 25 Swannington Road Broughton Astley Leicestershire LE9 6TU England Telephone 44 1455 285520 FA...

Page 3: ...bottom of meter See drawing 8 Hand tighten union nuts No wrenches 9 Protect meter from ultra violet UV rays 10 VALVES avoid system that will impose a sudden burst of flow to the meter Such a burst wi...

Page 4: ...ad the Instruction Guideline on the next page before installing your flowmeter This flowmeter is an instrument special care should be taken when handling and installing Materials of Construction Meter...

Page 5: ...er from direct sunlight Always use teflon tape thread sealant DO NOT use pipe dope compounds as these products may cause crazing and cracking on the meterbody Do not use solvent based glued such as PV...

Page 6: ...o wrenches 3 Wall floor and ceiling mounts are to be carefully aligned and sturdy Wall floor and ceiling supports are recom mended as needed 4 Valves Avoid a system that will impose a sudden burst of...

Page 7: ...the products in accordance with the information contained in this manual Should this equipment be used in or with any nuclear installation or activity purchaser will indemnify OMEGA and hold OMEGA har...

Page 8: ...Paddlewheel Systems Totalizers Batch Controllers pH CONDUCTIVITY pH Electrodes Testers Accessories Benchtop Laboratory Meters Controllers Calibrators Simulators Pumps Industrial pH Conductivity Equip...

Reviews: