![Omega Engineering 100/200 Series User Manual Download Page 30](http://html.mh-extra.com/html/omega-engineering/100-200-series/100-200-series_user-manual_738159030.webp)
3-14 DaqBook Hardware
01-23-02
OMB-DaqBook User’s Manual
4 – Remove termination panels
Remove the two screws mounting each termination panel to the card drawer.
P1 Interconnect Board
DaqBook/200 sits
on a shelf above
the card drawer
Card Drawer to Chassis Connector
Termination Panel
(1 of 3)
JP1 Jumper
Step 6B
JP2 Jumper
Step 6A
Standoff
(2 per card)
Card Drawer
DBK Card to
Interconnect Board
Steps 7A and 10A
Top Cover
(
)
cut-away view
Internal DB37 connects
to DBK cards. (1 of 3)
DaqBook/260 Hardware Setup
Thumbscrew
(1 of 3)
Steps 3B and 13C
Termination Panel to
Card Drawer Screws
Steps 4 and 12
DBK Card to
Card Drawer Screws
Steps 7B and 10B
Card Drawer to
Chassis Screw
(1 of 2)
Steps 3A and 13D
Card Drawer to
Chassis Screw
(1 of 2)
Steps 3A and 13D
Top Cover Screws
Steps 2 and 15
5 – Determine power requirements
Depending on the power needs of your system’s DBK cards, you may need to add a power card.
Reference Note
:
Both the
DBK Basics
section of this manual and the
Power Management
section of the
DBK Option Cards and
Modules User’s Manual
(p/n OMB-457-0905) contain power-related information. As a part of product support,
the DBK manual is automatically loaded onto your hard drive during software installation. The default location
is the
Programs
directory, which can be accessed through the Windows Desktop.
DaqBook/260 Hardware Setup
Summary of Contents for 100/200 Series
Page 4: ...vi 10 29 02 OMB DaqBook User s Manual ...
Page 6: ...viii 10 29 02 OMB DaqBook User s Manual ...
Page 46: ...pg 12 OMB DBK Basics 02 19 02 Daq Systems ...
Page 48: ...A 2 02 14 02 Appendix A Specifications DaqBooks This page is intentionally blank ...
Page 50: ...A 4 02 14 02 Appendix A Specifications DaqBooks ...