background image

Use and maintenance manual complete of 

EC

 conformity declaration

LIFTING BRACKET

Article numbers: 

B01.13

San Maurizio C.se - 23/11/2018

www.omcr.it

Via Quarantelli 8 -10077 - S. Maurizio C.se - Italy

T

 +39 011 996 46 11 - 

F

 +39 011 996 46 46

C.F./P.IVA 

07677130010

[email protected] - www.omcr.it

Summary of Contents for B01.13 Series

Page 1: ...EC conformity declaration LIFTING BRACKET Article numbers B01 13 San Maurizio C se 23 11 2018 www omcr it Via Quarantelli 8 10077 S Maurizio C se Italy T 39 011 996 46 11 F 39 011 996 46 46 C F P IVA...

Page 2: ...l B01 13 San Maurizio C se 23 11 2018 www omcr it 1 Risks Evaluation 2 Symbols and warnings classification 3 Use 4 Handling and storage 5 Maintenance 6 EC conformity declaration page 3 page 3 page 4 p...

Page 3: ...alyzed according to UNI EN 10204 samples of all materials have been subjected to tensile stress test according to UNI EN 10002 An improper or opposed use in reference to the prescriptions treated in t...

Page 4: ...ficers have to choose the most suitable sling to ensure a safe suspension with a correct load balance A wrong sling method can modify the real capacity load of the ropes chains and lifting accessories...

Page 5: ...e Pic 1 WARNING Pic 1 WARNING G DIE AXIS DIE AXIS The missing respect of the prescriptions included in this manual may cause the accidental fall of the load G Die load center Minimum rope angle from v...

Page 6: ...s required to use threadlocker LOCTITE 243 or lock washers WARNING 3 4 For a safe use of the bracket type B01 13 is necessary that the booms of the ropes chains stay always stretched see Pic 2 a loose...

Page 7: ...he lifting bracket 7 000 2 3 500 kg Don t make lifting handling with slings that have an angle of over 90 to the horizontal level in opposed case can happen the extraction of the pin with the risk of...

Page 8: ...RAGE In the following table are written OMCR B01 13 lifting brackets weights the lifting brackets must be handled in compliance with the current norms concerning the movement by hand of the loads WARN...

Page 9: ...ropes chains with a following overload on the lifting brackets inspect visually the lifting brackets paying particular attention to any eventual evidence of deformations and in case replace them repl...

Page 10: ...the technical file acting in OMCR Via Quarantelli 8 10077 San Maurizio C se These procedures have been exactly issued to allow OMCR mark with EC symbol to ensure that these products are in compliance...

Reviews: