
10
Operation
DRAWING OFF STEAM
1. To ensure perfect operation, clean the 2-stage frothing jet regularly. Screw the nozzle off and hold the
nozzle at the top and at the bottom end and screw it apart. Thoroughly rinse the 3 parts under running
water.
2. Make sure the nozzle has engaged properly. If the nozzle is clogged with dried milk or has not been
attached properly, it might suddenly come off during operation.
3. Install the replaceable 2-stage frothing jet. This is included in your Welcome Pack. Do not replace the
replaceable steam/hot water nozzle directly after drawing off steam because the nozzle is hot after the
draw-off operation.
4. Steam can be used for heating liquids and frothing milk for cappuccino. Make sure that the replaceable 2
stage frothing jet is pushed upwards when liquids are heated. To froth liquids, push the 2-stage frothing jet
downwards turning it slightly.
5. During frothing, some water will escape the system before the actual frothing process. This does not affect
the result (e.g. when frothing milk).
6. At the start of the steam draw-off operation, there can be splashing and the 2-stage frothing jet becomes
hot. Avoid direct contact with the skin. [This will appear on the screen: READY]
7. Place a cup under the 2-stage frothing jet and immerse it in the milk to be frothed or the liquid to be heated.
Press the steam pre-selection key. [This will appear on the screen: HEATING / STEAM / READY]
8. To draw off steam, open the steam/hot water draw-off tap. The illuminated ring is active.
9. You can adjust the steam draw-off time individually by turning the Rotary switch until the required SEC are
displayed. For example: 35 SEC
10. If you do not change the steam draw-off time settings using the Rotary switch, the machine will use the
settings last adjusted. During the steam draw-off operation, the message STEAM is displayed. When the
steam quantity is reached, the message CLOSE TAP is displayed
11. Close the steam/hot water draw-off tap. [This will appear on the screen: READY]
12. As long as STEAM READY is on view in the display, the machine is ready to dispense steam. Before
CLOSE TAP, steam may still escape the system.
DRAWING OFF STEAM WITH THE PROFESSIONAL-CAPPUCCINO FROTHER [OPTIONAL]
The Professional-Cappuccino Frother is optionally available.
CONNECTING THE PROFESSIONAL-CAPPUCCINO FROTHER TO THE COFFEE MACHINE
1. Disassemble the replaceable hot water nozzle or the replaceable 2-stage frothing jet.
2. Mount the Professional-Cappuccino Frother.
3. Press one side of the hose into the opening behind the dial. The optionally available milk container can be
used for sucking in milk.
DRAWING OFF CAPPUCCINO AND HOT MILK WITH PROFESSIONAL-CAPPUCCINO FROTHER
1. Fill the milk container with milk or immerse the hose in the milk directly.
2. Place a cup under the Professional-Cappuccino Frother.
3. Press the steam pre-selection key. [This will appear on the screen: HEATING / STEAM / READY]
4. To draw off steam open the steam/hot water draw-off tap. The illuminated ring is active.
5. You can adjust the steam draw-off time individually by turning the Rotary switch until the required SEC is
displayed. For example: 35 SEC
6. If you do not change the steam draw-off time settings using the Rotary switch, the machine will use the