9
Installation
8. THESE UNITS ARE SUITABLE FOR INSTALLATION ON NON-COMBUSTIBLE SURFACES ONLY.
Noncombustible clearances: 0’’ sides (0mm) 6’’ rear (152 mm) 4’’ floor (102 mm).
9. Do not obstruct the flow of combustion and ventilation air, under the unit by the legs or behind the unit by
the flue. Do not place objects between the bottom of the unit and the counter top.
10. There must be adequate clearance for removal of the front panel. All major parts except the burners are
removable thru the front if the gas line is disconnected.
11.
It may be necessary to adjust the balance of gas volume and air supply to each burner. This must be done
by an authorized service technician.
12. Pipe threading compound must be resistant to the action of liquefied petroleum gases.
COMMISSIONING
Commissioning of your new charbroiler is of the utmost importance. Commissioning is the thorough and
methodical testing of the equipment, sub systems, and systems to ensure that the final product functions
properly and safely at the work site. By identifying any potential problems (i.e.: equipment location, ventilation,
local fire/electrical codes, installation, operator training and certification) prior to equipment being placed into
service, costly outages and potential damages may be avoided.
CONVERSION KIT INSTRUCTIONS FOR GAS COUNTERTOP CHARBROILER
IMPORTANT SAFETY NOTICE
These conversion instructions are for conversion of the GAS charbroiler. The instructions provide in this kit
are for the conversion of Natural Gas to L.P. gas and refer to the conversion of the unit and kit provided.
An authorized licensed technician must be called to perform the complete conversion of the unit. Failure to
properly convert this unit, can result in serious injury, property damage or death and will void warranty.
CHARBROILER CONVERSION KIT INSTRUCTIONS
Warning: Do not attempt gas conversion by yourself. Gas conversion of your unit is to be made by a
certified/licensed technician.
CONVERSION
Instructions are for conversion from Natural Gas to Propane (L.P.) on all models. The conversion should be
done before connecting the unit to the gas supply. Units are shipped from the factory equipped for use on
natural gas. Parts necessary for L.P. (liquid propane) are provided with the unit. Turn off the main gas supply
before doing any maintenance.
1.
Remove the knobs and front panel.
2. Unscrew bolts and pilot valve, then remove manifold.
3. Replace the orifice fittings into the valve.
Note: Unit Number on side of orifice fittings.
4. Replace the front panel and knobs.
5. Before installing the included convertible regulator, unscrew the octagon cap. You can read (NAT) on the