background image

Page 6 from

 

6

WARRANTY

Olympia Electronics guarantees the quality, condition and operation of the goods. The period of 
warranty is specified in the official catalogue of Olympia Electronics and also in the technical leaflet, 
which accompanies each product. This warranty ceases to exist if the buyer does not follow the 
technical instructions included in official documents given by Olympia Electronics or if the buyer 
modifies the goods provided or has any repairs or re-setting done by a third party, unless Olympia 
Electronics has fully agreed to them in writing. 

Products that have been damaged can be returned to 

the premises of our company for repair or replacement, as long as the warranty period is valid.

Olympia Electronics reserves the right to repair or to replace the returned goods and to or not charge 
the buyer depending on the reason of defection. Olympia Electronics reserves the right to charge or 
not the buyer the transportation cost.

HEAD OFFICE

72

nd

 

km

O

.

N

.

R

Thessaloniki-Katerini

P

.

C

. 60300 

P.O.

 

Box 06 

Ε

ginio Pierias

 

Greece

www.olympia-electronics.gr
[email protected]

Battery replacement process

(*) 

Maintained operation: The luminaire lights its 

illumination source, when it is powered by the 
mains power supply or not

It can be done only by a competent person and after the mains interruption

.

1   Unfasten the two side cover screws and remove the plastic cap (with the indications) by sliding 
     it gently to the right.
2   Remove the old battery. Install the new one and place the connector as shown 

ο

n the picture. 

3   Refit the plastic cap (with the indications) by sliding it gently to the left and fasten the removed  
     screws in step 1.

WARNING

!! 

Use a maximum torque of

 

0,

9

Ν

m

 

to tighten the screws

.

ΝΟΤΕ!! In case of battery replacement the used battery must be replaced with a new one of 
the same type, by the manufacturer or by a competent person.

   

2

1

NOTE: LED= Light Emitting Diode

LABELING EXPLANATION:
X: 

Self contained  

 

1: 

Maintained

 (*)   

A: 

Including test device

E: 

With non-replaceable lamp(s) and/or battery

F: 

Automatic test gear  complying with IEC 

61347-2-7 denoted EL-T

G: 

Internally illuminated  

 

90: 

1.5 hour duration

180:

 3 hours duration

Note!! If a module will be used (except the fault 
relay module),  then t

he installer should fill in

, on 

the specification label,

 the letter

s

 

B  C

.

X

1

9 0

A

E F G

923064003_09_00

2

Summary of Contents for LLB-26/90

Page 1: ...est is performed This test will last for the stated duration and can only be performed when the battery is fully charged steady green LED The white LEDs will be lit and the red LED will flash during this test sequence Automatic Autonomous Test The Automatic Autonomous Test measures SELF TESTING MAINTAINED EMERGENCY LUMINAIRIES WITH LEDs OPERATION TEMPERATURE RANGE RELATIVE HUMIDITY VIEWING DISTANC...

Page 2: ... lamp replacement these must be replaced by parts of the same type by the manufacturer or by a competent person 4 In case of inactive use for a period greater than 2 months disconnect the battery by pulling out the battery s connector 5 I s not allowed to discard batteries t i into common trash bins they must be discarded only in battery recycling points Do not incinerate The light source containe...

Page 3: ...ire and use the two supplied mounting screws to install the aluminum bracket to the plastic bracket figure 2 Slide the luminaire to the aluminum bracket and use the bolt on the center to stabilize the luminaire figure 2 CEILING MOUNTING double sided Remove the aluminum bracket from the luminaire and install it with the included spacers screws and plugs in the ceiling page 3 Slide the luminaire to ...

Page 4: ...Figure 2 Side view Figure 1 GENERAL Measure the distance of the mounting holes and after the drilling place on these spots the mounting plugs and fasten the base with the mounting screws Figure 3 Front view Figure 4 Aluminum bracket Plastic bracket Page 4 from 6 1 2 SIDE WALL CLEARANCE Depending on the size of the luminaire the distance from the side wall must be more than LLB 26 440mm LLB 40 580m...

Page 5: ...INSTALLATION double side luminaire A 1136 SET OPTIONAL AFTER REQUEST INSTALLATION PICTOGRAMMS 1 Unfasten the two screws of the luminaire and remove the top part of the luminaire 2 Insert the pictogramm after removing the protective film from the back side 3 Carefully fit the top aluminium cover and reinstall the retaining screws 923064003_09_002 ...

Page 6: ...ectronics gr info olympia electronics gr Battery replacement process Maintained operation The luminaire lights its illumination source when it is powered by the mains power supply or not It can be done only by a competent person and after the mains interruption 1 Unfasten the two side cover screws and remove the plastic cap with the indications by sliding it gently to the right 2 Remove the old ba...

Reviews: