ELECTRICAL CONNECTIONS (after the mains interruption)

1

2

3

4

5

6

7

Unfasten the two side cover screws and remove the plastic 
cap by sliding it gently. Install

 

the gasket and make a hole in 

the  center  by  using  a  small  screwdriver.  Pass  the  round 
cable through the gasket.
Connect the mains cables to the respective terminal block

Ν 

for  neutral

L  for  live  wire,

 

L1  for  the  maintained 

operation and the      for ground connection

The L

wire 

can  be  connected  to  an  external  switch  to  control  the 
maintained  or  non  maintained  operation  of  the  luminaire

.

 

For permanent maintained operation use two wires to power 
the luminaire, 

Ν 

for neutral and L for live wire, and link the L 

and

 

L1. The 

A

 and 

B

 contacts are used only if an optional 

module is connected.Refer to the modules manual for more 
information regarding connection.
The  battery  is  not  connected.  See  the  section  “Battery 
replacement  process”  to  access  the  battery  compartment 
and connect the battery.

ATTENTION!!

 

Make sure that the ground cable is attached 

to the respective ground connector. 

Replace the removed 

parts in the previous steps. 

SURFACE MOUNTING ON A WALL (single sided)

Install the included plastic bracket on the wall (figure 1).
Remove the aluminum bracket from the luminaire and use 
the two supplied mounting screws to install the aluminum 
bracket to the plastic bracket (figure 2). Slide the luminaire to 
the aluminum bracket and use the bolt on the center 

(*)

, to 

stabilize the luminaire (figure 2). 

CEILING MOUNTING (double sided)

Remove the aluminum bracket from the luminaire and install 
it with the included spacers, screws and plugs in the ceiling 
(page 3). Slide the luminaire to the aluminum bracket and 
use the bolt on the center 

(*)

, to stabilize the luminaire (figure 

4). 
Power on the device at the end of the installation

.

 

NOTE!! After finishing the installation you must power 
the luminaire at least for 24 hours for battery charging to 
perform the nominal autonomy.

INSTALLATION INSTRUCTIONS

(*)

 First, hand tighten it and then, 

use pliers to tighten it little bit 
more (not all the way).
 

LED MODULE CHARACTERISTICS

Manufacturer

Model Number
Voltage Range

Connections

Nominal Power

Temperature (tc)

Olympia Electronics S.A

45 °C max. across the board

50 °C max. across the board

45 °C max. across the board

Non reversible connection between main pcb and led module

14 - 16.5VDC

0204185

2405185

2705185

7.2W

4.5W

11.7W

LLB-26/90-LLB-26/180

LLB-40/90-LLB-40/180

LLB-64/90-LLB-64/180

Page 3 from

 

6

N

L

L1

B

  A

Ground 

connector

2

1

Cable 

entry

Screws

L1

L

L1

N

N

L

PE

L1

L

L1

N

N

L

PE

Maintained

operation

(Default)

Non-maintained

operation

Luminaire

terminals

Luminaire

terminals

Connection Diagramms

923064003_09_00

2

Summary of Contents for LLB-26/90

Page 1: ...est is performed This test will last for the stated duration and can only be performed when the battery is fully charged steady green LED The white LEDs will be lit and the red LED will flash during this test sequence Automatic Autonomous Test The Automatic Autonomous Test measures SELF TESTING MAINTAINED EMERGENCY LUMINAIRIES WITH LEDs OPERATION TEMPERATURE RANGE RELATIVE HUMIDITY VIEWING DISTANC...

Page 2: ... lamp replacement these must be replaced by parts of the same type by the manufacturer or by a competent person 4 In case of inactive use for a period greater than 2 months disconnect the battery by pulling out the battery s connector 5 I s not allowed to discard batteries t i into common trash bins they must be discarded only in battery recycling points Do not incinerate The light source containe...

Page 3: ...ire and use the two supplied mounting screws to install the aluminum bracket to the plastic bracket figure 2 Slide the luminaire to the aluminum bracket and use the bolt on the center to stabilize the luminaire figure 2 CEILING MOUNTING double sided Remove the aluminum bracket from the luminaire and install it with the included spacers screws and plugs in the ceiling page 3 Slide the luminaire to ...

Page 4: ...Figure 2 Side view Figure 1 GENERAL Measure the distance of the mounting holes and after the drilling place on these spots the mounting plugs and fasten the base with the mounting screws Figure 3 Front view Figure 4 Aluminum bracket Plastic bracket Page 4 from 6 1 2 SIDE WALL CLEARANCE Depending on the size of the luminaire the distance from the side wall must be more than LLB 26 440mm LLB 40 580m...

Page 5: ...INSTALLATION double side luminaire A 1136 SET OPTIONAL AFTER REQUEST INSTALLATION PICTOGRAMMS 1 Unfasten the two screws of the luminaire and remove the top part of the luminaire 2 Insert the pictogramm after removing the protective film from the back side 3 Carefully fit the top aluminium cover and reinstall the retaining screws 923064003_09_002 ...

Page 6: ...ectronics gr info olympia electronics gr Battery replacement process Maintained operation The luminaire lights its illumination source when it is powered by the mains power supply or not It can be done only by a competent person and after the mains interruption 1 Unfasten the two side cover screws and remove the plastic cap with the indications by sliding it gently to the right 2 Remove the old ba...

Reviews: