![OLT SSGS1216-FJ-Ply Assembly Manual Download Page 41](http://html1.mh-extra.com/html/olt/ssgs1216-fj-ply/ssgs1216-fj-ply_assembly-manual_3905841041.webp)
Parts (Step 74)
Facia Cleat Short
(3/4” x 1 1/2” x 36 1/2”)
x 2
Facia Cleat Long
(3/4” x 1 1/2” x 40”)
x 4
Hardware (Step 74)
S2 - 1 1/4” Screws
x 18 total
74.
Attach
Facia Cleat Short
centered on underside of
Polygal Side of roof plywood, flush to edge. Attach
Facia
Cleat Long
to underside of roof on Non-Polygal side, flush
edge to edge. Repeat this step on rear of shed. Fasten each
cleat with
3 - 1 1/4” screws
per piece..
Parts (Step 75, 77)
F&R Facia (angled ends)
(3/4” x 5 1/2” x 81 1/4”)
x 4
Hardware (Step 75, 77)
N1 - 1 1/2” Finishing Nails
x 40 total
75.
Attach
Front and Rear Facia (angle cut on ends)
, to
Facia Cleats
on Non-Polygal Roof side, with
10 - 1 1/2”
Finishing Nails
per piece. Line up Facia so Facia ends line
up with
Rafter
ends.
Expert Advice:
Do a dry run by lining up Front, Rear and Side Facia to confirm positioning prior
to attaching
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 41