OLT GS84-S Assembly Manual Download Page 4

Thank you for purchasing our 8x4 GardenSaver -Single Door Shed. 
Please take the time to identify all the parts prior to assembly.

Parts List: 

A. Floor Section  

 

1 - 45 ½” x 75” - 

Large Floor Frame

 (2 Joists unattached)  

 1 - 45 ½” x 21” - 

Small Floor Frame 

(2 Joists ATTACHED) 

 2 - 1 ½” x 3 ½” x 72” - 

Floor Joists

 

 

(Steps 1 - 3)

 

  
 5 - 1 ½” x 3 ½” x 45 ½” - 

Floor Runners

 

 

(Steps 4 - 6)

 

  
 1 - 5/8” x 45 ½” x 75” - 

Plywood Flooring

 

 1 - 5/8” x 45 ½” x 21” - 

Plywood Flooring

 

 

(Steps 7 - 8)

 

 

B. Wall Section

 

 

4 - 1 ½” x 2 ½” x 45 ½” - 

Wall Plates

 

 

4 - 45 ½” x 75” - 

Solid Wall Panels 

 

1 - 45 ½” x 75” - 

Window Wall Panel

 

 1 - 12” x 73” - 

Narrow Wall Panels

 

 

(Steps 9 - 18)

 

 
 1 -  2” x 3 ½” x 45 ½” - 

Door Header - (Dado top edge)

 

 2 -  ¾” x 3 ½” x 73” - 

Door Jambs - Vertical 

 

 

(Steps 19 - 21)

 

  
 2 - 

Top Triangular Siding Pc for

 

Angle Wall Extendors (L/R)

 

 2 - 4

5 ¼

” - 

Angle Wall Extendors (L/R)

 

 2 - 9” x 45 ½” - 

Wall Extendors

 

 

(Steps 22 - 28)

 

 
 1 -  ¾” x 3 ½” x 70” - 

Horizontal Wall Cleat

 

 1 -  ¾” x 3 ½” x 21” -  

Horizontal Wall Cleat 

  

 

(

Step 29) 

 

 

  

C. Rafter & Roof Section 

 

6 - 1 ½” x 2 ½” x 54” - 

Rafters

 

 2 - ½” x 3 ½” x 48” - 

Front Soffits

 

 2 - ½” x 3 ½” x 48” - 

Rear Soffits

 

 

(Steps 31 - 36)

 

     

  
 2 - 

Rafter/Facia Nailing Strips

 - ¾” x ¾” x 51” 

 

(Step 37) 

  

  
 2 - 

Roof Panels

 - 51” w x 56” d (1 - Left 1- Right) 

 

(Steps 38 - 40

)

    

  
 4 - 5 ½” Wide x 16” to 18” long - 

Filler Shingles 

 

 

(Steps 41 - 44)

 

 

  

D. Miscellaneous Section

 

(Skirting, Trim, Door, Facia & Misc. Parts

 6 - ¾” x 4 ½” x 45 

¼

” - 

Bottom Skirting

 (Bevel Siding) 

 (Steps 47 - 50)

 

 
 8 - 7/8” x 2 ½” x 36” - 

Corner Filler Trims

 

 2 - 7/8” x 2 ½” x 10” - 

Front Center Corner Filler Trims

 

 (Steps 51 - 53) 

  

  
 2 - ½” x 5 ½” x 79” - 

Rear Corner Trims

 

 2 - ½” x 5 ½” x 88 ¾” - 

Front Corner Trims

 

 2 - ½” x 2 ½” x 80” - 

Side Rear Corner Trims

 

 2 - ½” x 2 ½” x 88 ¾” - 

Side Front Corner Trims 

 1 - ½” x 2 ½” x 79” - 

Rear Middle Trim

 

 (Steps 54 - 57) 
 

 2 - ½” x 3 ½” x 77 ½” - 

Vertical Door Trims 

 1 - ½” x 2 ½” x 46 ¾” - 

Horizontal Door Trim 

 1 - ½” x 3 ½” x 8 ¾” - 

Front Middle Trim

 

 (Steps 58 - 60)

 

  

 1 - 31 

½”

 x 72” - 

Full Door 

 

(Steps 61 - 63)

 

 
 2 - ½” x 4” x 54 1/8” - 

Side Facia

 (Angle Cut Ends) - reverse 

 4 - ½” x 4” x 50 ½” - 

Front and Rear Facia

 

 

(Steps 64 - 66)   

 

  
 2 - ½” x 4 ½” x 51 5/8” - 

Roof Ridge Boards

 

 

(Step 67)

 

 

  

 2 - 

Detail Facia Plates

 (4” high) 

 

(Step 68) 

     

  
 1 - ½” x ½” x 32” - 

Upper Horizontal Door Stop

 

 4 - ½” x ½” x 36 ¼” - 

Vertical Door Stops

 

 

(Steps 69 - 70) 

 
1 Aluminum Window Insert  
 (Steps 71 - 72) 
 
Window Trim Pkg

 

1 - 24 1/16” angle cut / 3 - 23” Straight Cut - 

Window Trim Kit 

 (Step 73) 
 
1 Flower Box Kit 
 (Step 74) 

  

 1 - 45 ¼” - Extra Piece of Bevel Wall Siding - Use if wall 
panel siding is damaged or to shim floor or door. 
 

Optional Pieces - When Door configured on end. 
 

1

 - 

1 ½” x 3 ½” x 73” - Optional Door Jamb 

 1 - ½” x 2 ½” x 42 ½” - Optional Horizontal Door Trim 
 1 - ½” x 2 ½” x 88 ¾” - Optional Front Middle Trim

 

 

(Optional - Steps 77 - 80)

Note: All Trim, Facia and Bottom Skirting pieces 
will be positioned rough face out when installed.

  Toll Free 1-888-658-1658              www.outdoorlivingtoday.com        [email protected]

Page 4

Summary of Contents for GS84-S

Page 1: ...ts will not be provided free of charge after the 30 day grace period All structures purchased from Outdoor Living Today are covered for a period of one year for defects in manufacturing and workmanshi...

Page 2: ...ide on the type of foundation you will be using Concrete slab or 4 6 inches of crushed gravel with paver stones or 4x4 stringers You can nd the footprint for your shed on Page 3 of your Assembly Manua...

Page 3: ...d of floor frame Saves money on materials easy to level and work with Gravel with Patio Paver Stones Excavate at least 6 deep and 6 wider than floor frame on each side 1 0 Cubic Yards of gravel requir...

Page 4: ...cia Misc Parts 6 x 4 x 45 Bottom Skirting Bevel Siding Steps 47 50 8 7 8 x 2 x 36 Corner Filler Trims 2 7 8 x 2 x 10 Front Center Corner Filler Trims Steps 51 53 2 x 5 x 79 Rear Corner Trims 2 x 5 x 8...

Page 5: ...ot Provided Ladder Screw Gun Drill Tape Measure Hammer Wood Clamp Level Pliers Tools Required Not Provided 1 8 Drill Bit Barrel Bolt Utility Knife 2 1 2 1 1 4 3 4 90 Metal Bracket x 8 2 1 1 2 Finishin...

Page 6: ...nel Small gap between bevel siding and window trim Dab of caulking Strip of roofing paper over apex of roof panels Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page...

Page 7: ...2 x 71 7 8 as illustrated above Position Joists equally in Floor Joist Frame Use Small Floor Joist Frame as a template to determine joist position Position Joist so flush with framing 2 When correctly...

Page 8: ...r foundation Caution you may need 2 people to assist you Be careful when laying floor down not to bend or twist floor Note The floor will be flipped over and floor runners will sit on your foundation...

Page 9: ...each wall panel with 3 2 1 2 Screws Position so plates are flush with framing Note Plywood is cut slightly smaller than floor framing Keep plywood seams tight Important Pilot hole ALL 2x3 Wall Studs w...

Page 10: ...ned correctly locate 2nd Solid Wall Panel and place in corner Wall Plate Flush with floor framing Do not align wall siding to floor Align wall plate to outside of plywood floor 12 Butt both vertical w...

Page 11: ...h wall panel studs together as per Step 12 with 3 2 1 2 Screws 14 With Rear Wall Panel in place position other side wall panel on floor as per Step 10 11 Rear Wall Panel 15 Secure side wall panel to r...

Page 12: ...Side Wall Stud with 3 2 1 2 Screws Pilot Hole first 18 Align front corner Window Wall Panel as per Steps 11 12 using 3 2 1 2 Screws to secure wall studs together 19 Locate Door Jambs 2 3 4 x 3 1 2 x...

Page 13: ...will sit flush to outside of wall siding When positioned correctly secure Jambs using 4 2 1 2 Screws 21 Position and attach the Door Header to top of Narrow Wall framing and against window wall frami...

Page 14: ...o back 24 With Angled Wall Extendor and Side Wall aligned correctly secure together from the inside with 4 2 1 2 Screws 25 Complete opposite Angled Wall Extendor positioning and attachment as per Step...

Page 15: ...h Wall Extendor to both the Angled Wall Extendor framing and the front window wall framing with 5 2 1 2 Screws 28 Position and secure 2nd Wall Extendor Panel as per Steps 26 27 Additionally attach to...

Page 16: ...surements are not within 1 4 your walls are not square Adjusting now will make it easier to install roof section 9 9 1 4 29 Align Horizontal Wall Cleats 1 3 4 x 3 1 2 x 70 1 3 4 x 3 1 2 x 21 flush wit...

Page 17: ...h bottom 2x3 wall plates to plywood floor with 22 2 1 2 Screws Confirm Doorway opening is 32 wide Prior to securing make sure wall panels are aligned correctly on the floor Refer to Step 11 Wall sidin...

Page 18: ...ve Measure and attach remaining Soffit Rafter connections using 2 1 1 4 screws per rafter soffit Front Soffit Boards 2 Rear Soffit Boards 2 48 21 3 4 21 3 4 96 A B C Rear Soffit Mid Rafter Mid Rafter...

Page 19: ...e positioned equally from side to side Rafter sits on framing Front Soffit Rear Soffit Rear of GardenSaver 32 Carefully flip completed Rafter Section over so Front Soffit is facing the front and place...

Page 20: ...x 3 4 x 51 onto outside of each panel flush with plywood Attach with 4 1 1 4 Screws evenly spaced The Rafter Facia Nailing Strip provides for a greater nailing surface later when you attach side facia...

Page 21: ...s Complete both roof Panels 40 With Roof Panels aligned screw panels down to center rafters with 2 2 1 2 Screws in Bottom Row of Shingles Only 1 screw per panel Plywood flush with shingles on inside R...

Page 22: ...t filler shingle down to rafters using 1 2 1 2 Screw per panel 2 in total Screw on slight angle and make sure to screw into rafter Screw slightly above 3rd row of shingles exposure line This way the s...

Page 23: ...possible have a helper push roof panel down so plywood sits flush against rafter while securing Mid Rafter Plywood 3 2 1 2 screws Toe Nailed in each Mid Rafter 44 Slide 3rd and 4th Filler Shingles up...

Page 24: ...1 2 Finishing Nails per piece Rear Facia 2 Roof Ridge Boards 2 Side Angle Cut Facia 2 Side Front Corner Trim 2 Front Corner Trim 2 Front Rear Side Skirting 6 Full Door Black Tee Hinge 3 Door Hardware...

Page 25: ...2 7 8 x 2 1 2 x 10 Fillers are essentially nailing strips and will not be visible once additional corner trims are attached later Rear Skirting Gap Side Skirting Skirting meets flush in center Skirti...

Page 26: ...Finishing Nails There is an additional 10 long Front Center Corner Filler Trim that you will need to center and attach as well using 2 1 1 2 Finishing Nails 53 Position and attach Corner Filler Trims...

Page 27: ...hing Nails aligning tight underneath soffit and center on seam Tight underneath soffit 55 Place both trims in front corner and align as illustrated Do a dry run prior to attaching to achieve best fit...

Page 28: ...with inner face of Door Jamb Attach with 8 1 1 2 Finishing Nails Flush with Door Jamb Flush with Door Jamb Flush with bottom of Door Header 59 Locate Horizontal Door Trim 1 1 2 x 2 1 2 x 46 3 4 Posit...

Page 29: ...above Center hinge on mid trim and at bottom closer to the top of the door trim 60 Locate Front Middle Trim 1 1 2 x 3 1 2 x 8 3 4 Position tight against Horizontal Door Trim and in line with Vertical...

Page 30: ...1 2 x 4 x 50 1 2 Side Angle Cut Facia 2 1 2 x 4 x 54 1 8 In front corner align side and front Facia together Front facia will cap side facia 63 Once door is align in opening position so there is a 1...

Page 31: ...ard 1 2 x 4 1 2 x 51 5 8 at the front of roof to cap off shingles and facia Ridge Boards should meet on seam of roof panels When aligned correctly attach with 4 1 1 2 Finishing Nails per piece 68 Atta...

Page 32: ...reduce the chances of moisture entering into your shed Caulk gap Window frame Siding Butt Screw insert into bottom thick part of siding T h i c k b u t t o f s i d i n g Caulk gap 69 Attach Upper Inte...

Page 33: ...his Manual on Page 35 Center completed flower box below bottom of window trim and secure with 2 2 1 2 Screws Screw from inside of box into the cen ter wall stud Attach second screw 2 below first screw...

Page 34: ...se Door Header 45 1 2 long to align Jamb Jamb will overhang floor at bottom Jamb overhangs floor by 1 79 Attach Door Header as per Step 21 Door Header 1 2 x 2 1 2 x 42 1 2 Optional Hor Door Trim Reg F...

Page 35: ...ps 3 On a flat surface flip Flower Box on it s rear face Evenly space Brackets and secure through Base Frame and into the Brackets with 2 1 1 4 screws per Bracket Position completed Flower Box beneath...

Page 36: ...ght Delivery 4 Quality of Materials 5 Assembly Manual 6 Overall Satisfaction The materials contained in this Assembly Manual may be downloaded or copied provided that ALL copies retain the copyright a...

Reviews: